Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
19 May 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
+ Capital Works)
GENERAL
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Other terms and conditions shall follow clause-10 of GCC, April 2022 and Advance Correction Slip No.1 of GCC, April 2022 Note: No Technical & Financial credential are required for tenders having advertised value up to Rs. 50 Lakh
Definition of Similar Nature of Work:- Supply, Installation, Testing and Commissioning of Lift/ Escalator with or without AMC/ CAMC.
25 conditions · 5 needing a document upload
Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderers. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender.
The details of the works completed by the tenderer during the last three years to be filled in Annexure-I(a) & Details of contractual payment received by the Tenderer during the last 3 (three) financial years including the current financial year to be filled & submitted in Annexure-I(b).
The details of Plants and Machinery with the tenderer to be filled in Annexure- II.
Details of Personnel and Organization of the Tenderer to be filled in Annexure-III.
Details of Works presently on hand of the Tenderer to be filled in Annexure- IV.
The details regarding Association of Railway Officer s with the tenderer to be filled in Annexure- V.
List of the Arbitration cases of the Tenderer during last Five years to be filled in Annexure-VI.
List of the Court cases of the Tenderer during last Five years to be filled in Annexure- VII.
NEFT MANDATE FORM. All Payments to the agency including the refund of the Earnest Money of the unsuccessful bidder preferably will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure- VIII.
Documents to be uploaded in the website by the Tenderer : Online payments have been made and no documents are to be deposited.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer shall upload scanned copy of valid PAN and GSTIN in PDF format.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII and VIII respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderer's.
(A) Asansol Division - Asansol - Provision of 04 No lift at Asansol station.( Lift Part). (B) 05 years Comprehensive Maintenance Contract for lifts after completion of 02 years warranty period. (C) Electrical power supply Part .
EL-11-26
EL-11-26
Open
Works - General
12 Months
Paschim Bardhaman, West Bengal
₹0
₹2.5 L
19 May 2026
27 Apr 2026
5 May 2026
61 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 82,00,000 | ||
| — | 4.00 | — | — | ||
| Price for Design, Manufacture, Supply, Installation, Testing and Commissioning and Maintenance of heavy-duty (G+1) Lift of machine room less and gearless type 14 No. passenger capacity ( 952 Kg) ; rated speed : 1 Mtr/s ; No car Doors :2; Automatic electromagentic type in -built brake ; Intregrated type VVVF controller ; Microprocessor based controller for system control ; including with 02 years warrenty and complete with all safety devices as per RDSO Specification No. RDSO/2013/EM/SPEC/0016 (Rev-2) - 2025 or latest with amendments.Lift should have Automated Voice Announcement System. Lift shall comply Railway Board Harmonised guidelines for Divyangjans. The Lift should have Elevator Inter-Communication System.The Lift should have the provision of mechanical Brake Release system.The Lift should be provided with CCTV camera inside the Lift car. The Lift should be suitable to be connected to IR NIYANTRAC software. The Lift should have Emergency Lighting System. Warranty-Two years after successful commissioning and acceptance of the elevators as per Rly Bd L/No: 2013/Elect(G)/150/13/Pt.III (E.O 3502928) dated 23.07.2025 and its time to time ammendment . 05 years CAMC also included after competetion of 02 years warranty period as per above Rly Board circular ( 05 years CAMC cost separately qouted in Schedule- B ) | — | — | — | 82,00,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GenSpecofCableTray.pdf
ATTACHMENT
RailwayBoardcirculardt.12-02-2020.pdf
ATTACHMENT
RailBoardCircularDt.-23-07-25.pdf
ATTACHMENT
SPECNO.-RDSO2013EMSPEC0016Rev2-2025.pdf
ATTACHMENT
MasterTenderDocumentNew.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.7.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.8.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.9.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.10.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.11.pdf
ATTACHMENT
FormatforcertificateANNEXURE-V.pdf
ATTACHMENT
NewGenl.condition.pdf
ATTACHMENT
GeneralSpecification-ANNEXUREM.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
ExplanatoryNote_1.pdf
ATTACHMENT
LTpanelGeneralSpecification-AnnexureA_1.pdf
ATTACHMENT
PreliminaryCondition_1.pdf
ATTACHMENT
GuidelineschemeforfiresuppressionsystemincontrolpanelsLTpanels.pdf
ATTACHMENT
FormatofGuaranteeBond.pdf
ATTACHMENT
STRforElevator.pdf
ATTACHMENT
TechComp-IIIIII1.pdf
ATTACHMENT
ComlCompliance-U-IVVVIVIIVIII1.pdf
ATTACHMENT
CheckList_511.pdf
ATTACHMENT
GCC-April2022.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.1.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.3.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.4.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.5.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo.6.pdf
ATTACHMENT
SpacialConditionofcontractonlabourdata.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .