Tender Value
₹35.7 Cr
EMD Value
₹19.3 L
Closing Date
23 Feb 2026, 3:00 pmClosed
Construction of Limited Height Subway by air pushing technique in lieu of following LCs of Lucknow Division, NE Railway.:- (1) L.C. No 39/C at Km 40/7-8 between Ataria-Sidhauli, L.C. No. 58/C at Km 66/3-4 between Kamlapur-Baraijalalpur, L.C. No. 62/C at Km 72/6-7 between Kamlapur-Baraijalalpur, L.C. No 67/C at Km 79/8-9 between Kamlapur-Khairabad in the jurisdiction of ADEN/Sitapur and (2) L.C. No 15/C at Km 20/2-3 between Bangain - Bisheshwarganj in the jurisdiction of ADEN/Baharaich.
NER-LJN-2026-23
NER-LJN-2026-23
Open
12 Months
Sitapur, Uttar Pradesh
₹0
₹19.3 L
30 Jan 2026
30 Jan 2026
9 Feb 2026
B-CPWD-DSR-2021 ITEMS
Item Breakup - A-USSOR ITEMS
cum Total 470650.00 All the item as per attached Annexure-A-II based on NER-USSOR-2021 and any other item not Item- 2 included in this annexure but provided in Chapter-2 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area.
Metre Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
cum LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
364.00 Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of b r i d g e s including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
750.00 Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY
7277.88 machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in- Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
1079.50 tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
13911.70 pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level Total 40580847.43 All the item as per attached Annexure-A-III Supply of cement items only of Chapter-2 based on NER- Item- 3 USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Supply and using Cement at Worksite
43 approved brands/makes
Cement brands/makes Total 17999021.42 All the items as per attached Annexure-A-IV based on NER-USSOR-2021 and Supply of steel reinforement of approved brands/makes for R.C.V. work of Chapter-02 and as mentioned above Sr. Item- 4 No. 1 to 3 and 5 to 15, i.e. Annexture-A- I to III and Annexture V to XV but provided in NER-USSOR- 2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
bars of Kg grade Fe-500D or more of approved brands/makes. LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY Total 103782337.87 All the item as per attached Annexure-A-V based on NER-USSOR-2021 and any other items not Item- 5 included in this annexture but provided in Chapter-3 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No
2970.00 box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. Note: (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
MT Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT-Km Total 9779470.35 All the item as per attached Annexure-A-VI based on NER-USSOR-2021 and any other items not Item- 6 included in this annexture but provided in Chapter-4 of NER-USSOR-2021 with up to date correction slips. LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY S No. Item Description of Item Unit Qty Rate Amount No Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming t o IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Girder/Semi Girder/Composite Girder (Steel Work)
6250.00 and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 for bridges and s t e e l structures with contractors labour, tools and plants and lead and lift etc., complete. Providing road crane of specified lifting capacity with specified jib length revolving type for material handling, assembly & erection of girders/slab/RCC Box etc.
1120.00 over Item 041209 for every additional 1 MT capacity or part there of
225.00 and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. Total 56860219.80 LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY All the item as per attached Annexure-A-VII based on NER-USSOR-2021 and any other items not Item- 7 included in this annexure but provided in Chapter-5 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No
1400.00 less than 35 kg each at specified bridge locations.
402.90 consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media.
1250.00 to 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
anti Kg shrinkage compound w.r.t. cement.
1224.00 consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines. Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra).
1400.00 wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
205000.00 water from any location. Payment to be Hour done for Horse power of pump multiplied by pumping hours. Total 28882262.65 LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY All the item as per attached Annexure-A-VIII based on NER-USSOR-2021 and any other items not Item- 8 included in this annexure but provided in Chapter-8 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub- item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
720.00 than 200 km and up to 250 km Total 1379224.80 All the item as per attached Annexure-A-IX based on NER-USSOR-2021 and any other items not Item- 9 included in this annexture but provided in Chapter-11 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No
5700.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
2630.00 making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge. Total 1520253.70 LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY All the item as per attached Annexure-A-X based on NER-USSOR-2021 and any other items not Item- 10 included in this annexture but provided in Chapter-12 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No
750.00 available along formation on top or at c e s s , in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. Total 31785.00 All the item as per attached Annexure-A-XI based on NER-USSOR-2021 and any other items not Item- 11 included in this annexture but provided in Chapter-13 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Maintenance of track on main line & loops, Points & crossings etc. including special attention to section for carrying out various maintenance works listed in Indian Railways P.Way Manual / Bridge Manual for safe running of goods and passenger trains with contractor's tools / labours etc. complete, as directed by Engineer in- charge. Note: Contractor shall arrange one gang at any point of time comprising of minimum specified labours with sufficient experience in P.Way working.
100.00 physically fit labours plus 1 Mate. Note: (1) Day In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be deducted for each such person or non-availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor. Total 1212615.00 All the item as per attached Annexure-A-XII based on NER-USSOR-2021 and any other items not Item- 12 included in this annexture but provided in Chapter-18 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY
3.00 crossings with MS brackets, MS packing plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails. Manufacture, supply, assembly, erection, commissioning and testing of Lifting Barrier assembly, having fragmented boom, boom light boxes with suitable gate lamps, bell, boom supports (stay wires) with adjusters, counter weight, pedestal and lock posts with foundation of 'A' type as required, turn-union wheel with brackets, balance and auxiliary weights clamps etc. to approved standard drawing with all fittings and fastenings excluding fringes, complete with contractor's men, equipments and materials, as per specifications and as directed.
Set Total 411797.52 All the item as per attached Annexure-A-XIII based on NER-USSOR-2021 and any other items not Item- 13 included in this annexture but provided in Chapter-19 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Insertion of temporary girder in place of formation involving dismantling of track, removal of ballast and neatly stacking for future use, excavation & installation of CC crib or wooden crib at both ends as per approved design in one or more traffic blocks, excavation for creating space for insertion of girder as required, placement of girder by contractor's Crane, tools & plants, filling of earth/sand filled bags at different stages as required, linking of track and connecting with the approaches, ballasting, boxing and packing approach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge. Note: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. 2. Transportation of Temporary Girder to site shall be paid separately under relevant item. 3. The charges for wooden sleepers/blocks required for matting and bearing as per approved design shall be paid extra as per relevant item. 4. In case bridge timber / channel sleepers are required to be laid on girder, the same shall be paid separately under relevant item.
5.00 113480.43 16.3m and up to 26.00 using Road crane capacity of 80 MT
and sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY Removal of temporary girder, crib on both ends and placing temporary girder on crib / cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 kmph speed, boxing & dressing of cess, ballast profiling etc. N o t e : If earth is to be brought by contractor from outside, the same will be paid separately.
5.00 124639.03 16.3m and up to 26.00 using Road crane capacity of 80 MT Total 1232848.55 All the item as per attached Annexure-A-XIV based on NER-USSOR-2021 and any other items not Item- 14 included in this annexture but provided in Chapter-20 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti- corrosive paint or powder coating complete, as directed.
Indicator 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long Total 136414.25 All the item as per attached Annexure-A-XV based on NER-USSOR-2021 and any other items not Item- 15 included in this annexture but provided in Chapter-21 of NER-USSOR-2021 with up to date correction slips. S No. Item Description of Item Unit Qty Rate Amount No Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. LUCKNOW-NER-DIVISION-ENGINEERING/NORTH EASTERN RLY
1500.00 with minimum 1.10 cum bucket capacity
450.00 crane of 12T capacity for misc. works of handling of material
250.00 the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. Total 1698389.50
Item Breakup - B-CPWD-DSR-2021 ITEMS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GeneralConditions09.09.2025_1.pdf
ATTACHMENT
SpecialconditionLHSairpushingmethod.pdf
ATTACHMENT
GCC-2022-updateduptoACS10.pdf
ATTACHMENT
POAGuidelines.pdf
ATTACHMENT
Supplyofrainforcedsteelsplcondition2025.pdf Supply of reinforced steel spl condition 2025
ATTACHMENT
InstructionstoTenderers52025.pdf
ATTACHMENT
Supplyofrainforcedsteelsplcondition2025.pdf
ATTACHMENT
Download all tender documents and submit your bid