| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.5 LAccepted-AOC | L1 | Accepted-AOC Work awarded to the 1st lowest bidder | |
| 2 | L2₹96.8 L+₹11.3 L (13.2%)Rejected-Finance | L2 | Rejected-Finance Tender of the 1st lowest bidder is accepted | |
| 3 | L3₹1.7 Cr+₹81.0 L (94.8%)Rejected-Finance 701 HARBHAAJAN BUILDING CST ROAD KALINA SANTACRUZ EAST MUMBAI 400 098 | MUMBAI SUBURBAN | MAHARASHTRA | 400098 | L3 | Rejected-Finance Tender of the 1st lowest bidder is accepted | |
| 4 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | Rejected-Technical Technically not responsive | |
| 5 | Rejected-Technical 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | - | Rejected-Technical Technically not responsive |
Tender Value
Refer Docs
Closing Date
17 Nov 2021, 5:30 pmClosed
Chief Engineer, RRIP, Dhenkanal
Office of the CE, RRIP, Mahisapat, Dhenkanal, PIN-759001
Consultancy Services as Third Party Inspection Agency (TPIA) of pipe line project
2021_CEBMD_72110_1
CERRIP-EPC-03/2021-22
National Competitive Bid
Civil Works - Canal
Turn-key
730 days
Athagarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Exempted
24 May 2022
2 Nov 2021
18 Nov 2021
2 Nov 2021
17 Nov 2021
2 Nov 2021
2 Nov 2021 - 9 Nov 2021
Amount
Consultancy charges for QC/QA Planning& getting approval from CE, RRIP, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/ store including site inspection and checking of materials and equipments used as per design & specification approved by the Chief Engineer, Rengali Right Irrigation Project and submitting the final report for 24063 ha. of canal network including submission of Report
Consultancy charges for QC/QA Planning& getting approval from CE, RRIP, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/ store including site inspection and checking of materials and equipments used as per design & specification approved by the Chief Engineer, Rengali Right Irrigation Project and submitting the final report for 26334 ha. of CAD work including submission of Report
Green Design and Engineering Services Pvt. Ltd.
Aarvee Associates Architects Engineers and Consultants Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .