Loading…
Loading…
Tender Value
₹4.2 Cr
EMD Value
₹5.0 L
Closing Date
10 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
CHIEF ENGINEER JABALPUR ZONE
CHIEF ENGINEER JABALPUR ZONE MILITARY ENGINEER SERVICES RIDGE ROAD JABALPUR CANTT 482001
PROVISION OF SINGLE LIVING ACCN ALONGWITH ATTACHED TOILET FOR 24 JCOS FURNITURE AND ALLIED ACCESSORIES AT CHUSHUL COY IN AEC TRAINING COLLAGE AND CENTRAL PACHMARHI
2026_MES_746804_2
753023A PROVISION OF SINGLE LIVING ACCN ALONGWITH ATTACHED TOILET FOR 24 JCOS FURNITURE PACHMARHI
Open Tender
Civil Works
510 days
AGE(I) PACHMARHI
AS PER NIT
8 documents required · 8 mandatory
₹2,000
AGI(I) PACHMARHI
₹5.0 L
Yes
19 Jun 2026
19 Jun 2026
17 Jul 2026
19 Jun 2026
10 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 : Design & Construction of single living accn with garage for 24 JCOs with permanent specification, RCC frame construction with RCC M-25 design mix, provision of ATT, provn of mosquito proofing, Provn of roof treatment, exterior emulsion paint on external surface OBD in internal surface, complete all as specified and shown on drawings, Soil bearing capacity report, design basis report and tender documents. | 1 | Lump sum | - | - |
| 3 | Sch 'A' Part-II (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 4 | Sch 'A' Part-III (Demolition) Lump sum price worked out by the contractor for (Demolition) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-IV (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-V (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-VII (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-VIII (Security Compound wall and Gate) Lump sum price worked out by the contractor for (Security Compound wall and Gate) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-IX (Rain Water Harvesting) Lump sum price worked out by the contractor for (Rain Water Harvesting) as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
tender.pdf
Tender Documents • 9.97 MB
BOQ_866083.xls
BOQ • 1.09 MB
drg_merged_compressed.pdf
Additional Documents • 5.06 MB
Download all tender documents and submit your bid