Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-Finance 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | ₹24.3 L | L1 | Accepted-Finance LOW RATE QUOTED |
| 2 | L2₹25.0 LRejected-Finance NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | ₹25.0 L | L2 | Rejected-Finance HIGH RATE QUOTED |
| Sl No | Description | Qty | Unit | M/s. New Mohana Constructions L2 | M/s. PCN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING CEMENT CONCRETE ROAD IN SOLAIAMMAN NAGAR 1ST MAIN ROAD AT NALLUR PANCHAYAT | |||||
| 2.00 | Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,. | 34.32 | CUM | 150 ₹5,148 | 131.5 ₹4,513 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 141.14 | CUM | 3,150 ₹4.4 L | 3,005 ₹4.2 L |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple | 111.25 | CUM | 6,000 ₹6.7 L | 5,901.5 ₹6.6 L |
| 5.00 | Cement Concrete 1:3:6 ( One Cement Five sand and Ten Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple | 59.2 | CUM | 7,000 ₹4.1 L | 6,652.5 ₹3.9 L |
| 6.00 | Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete. | 70.57 | CUM | 7,250 ₹5.1 L | 7,192 ₹5.1 L |
| 7.00 | Towards centering chargers for all labour charges etc | 514.8 | CUM | 140 ₹72,072 | 136.5 ₹70,270 |
| 8.00 | Supplying and fixing of Bitumen pad for expansion joints | 23.52 | SQM | 300 ₹7,056 | 234 ₹5,504 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 3,82,032 ₹3.8 L | 3,71,217.96 ₹3.7 L |
Tender Value
₹24.6 L
EMD Value
₹49,180
Closing Date
4 Mar 2026, 3:00 pmClosed
BDO
Sholavaram block office
Providing CC road un Solaiamman nagar 1st main road at Nallur Panchayat
2026_RDTN_669314_1
1400/2025/A2
Open Tender
Civil Works - Roads
90 days
Sholavaram block office
As per documents
4 documents required · 4 mandatory
₹0
₹49,180
Yes
4 Mar 2026
2 Mar 2026
4 Mar 2026
2 Mar 2026
4 Mar 2026
2 Mar 2026
PROVIDING CEMENT CONCRETE ROAD IN SOLAIAMMAN NAGAR 1ST MAIN ROAD AT NALLUR PANCHAYAT
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Cement Concrete 1:3:6 ( One Cement Five sand and Ten Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Towards centering chargers for all labour charges etc
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TENDERDOCUMENTCCROAD.pdf
Tender Documents • 0.52 MB
BOQ_804226.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid