Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹490.89 (0.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
7 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O GATE FOR CHILDREN PARK AT MAIDAN MOHALLA
2026_RDPR_317679_33
NIT29
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,920
16 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in trenches for foundations, drains, pipes, cables etc. (≤1.5m width, ≤10 sqm plan), dressing sides, ramming bottoms, lift up to 1.5m, disposal of surplus earth, all kinds of soil. | 4.84 | cum | 479.3 | ₹2,319.81 |
| - | Dry stone soling, hand packed, including all carriages complete. | 0.38 | cum | 1,200 | ₹456 |
| - | Cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate, 40mm size), curing, excluding centering/shuttering, including carriage. | 0.34 | cum | 5,202.9 | ₹1,768.99 |
| - | RCC 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate, 20mm size), curing, excluding centering/shuttering/finishing/reinforcement, including carriage, for underground pillars & tie beam. | 2.01 | cum | 7,788.4 | ₹15,654.68 |
| - | RCC 1:1.5:3 (same as above), curing, excluding centering/shuttering/finishing/reinforcement, including carriage, for above-ground pillars. | 1.34 | cum | 9,395.7 | ₹12,590.24 |
| - | Centering & shuttering including strutting, propping & removal for foundations, footings, | 9.4 | sqm | 286.35 | ₹2,690.26 |
| - | Centering & shuttering including strutting, propping & removal for columns. | 11.88 | sqm | 742.55 | ₹8,821.49 |
| - | Carriage of aggregate by mechanical transport, average lead 3 km. | 3.01 | cum | 165.84 | ₹499.18 |
| - | Carriage of sand by mechanical transport, average lead 20 km. | 1.51 | cum | 409.94 | ₹619.01 |
| - | Steel reinforcement for RCC work, Fe-500D bars, straightening, cutting, bending, placing & binding complete (calculated @110kg/cum for RCC items). | 368.36 | kg | 123.2 | ₹45,381.95 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1042625.xls
BOQ • 0.24 MB
corrigendum.pdf
PDF • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .