Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹42,000 (15.3%)Admitted-Finance | ₹3.2 L+₹42,000 (15.3%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹98,900 (36.1%)Admitted-Finance | ₹3.7 L+₹98,900 (36.1%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 L+₹99,000 (36.1%)Admitted-Finance | ₹3.7 L+₹99,000 (36.1%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RATHORE ELECTRICALS L3 | Pankaj Trading Company L1 | M/S Tesla Enterprises L2 | chauhan enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Opening of H.V. side bushing connection of 05 M.V.A. Power Transformer with replacement of 03 Nos. damage bushing rod drain out of Transformer oil from main tank to empty oil tank/drums. | 2 | Job | 18,000 ₹36,000 | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest | 15,900 ₹31,800 |
| 2.00 | Opening of L.V. side bushing/Neutral bushing connection of 05 M.V.A. Transformer with replacement of 03 Nos. damage bushing rod. | 2 | Job | 12,600 ₹25,200 | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest | 12,000 ₹24,000 |
| 3.00 | Removal of damaged packing of LV side bushing/metal parts & replacement with new gaskets/metal parts, its fixing after proper cleaning. | 2 | Job | 13,500 ₹27,000 | 8,000 ₹16,000 Lowest | 10,000 ₹20,000 | 14,500 ₹29,000 |
| 4.00 | Removal of damaged packing of HV side bushing /metal parts & replacement with new gaskets/metal parts, its fixing after proper cleaning. | 2 | Job | 18,500 ₹37,000 | 8,000 ₹16,000 Lowest | 10,000 ₹20,000 | 18,000 ₹36,000 |
| 5.00 | Removal of damaged packing of neutral bushing & replacement with new gaskets, and fixing it after proper cleaning. | 2 | Job | 12,000 ₹24,000 | 8,000 ₹16,000 Lowest | 10,000 ₹20,000 | 12,500 ₹25,000 |
| 6.00 | Replacement of complete Top cover gasket by opening of all accessories, nuts bolts and other required completing the work satisfactorily. | 2 | Job | 15,600 ₹31,200 | 8,000 ₹16,000 Lowest | 10,000 ₹20,000 | 14,600 ₹29,200 |
| 7.00 | Replacement of damaged OTI of 05 M.V.A. Power Transformer with including all associated work as per requirement. | 2 | Job | 18,000 ₹36,000 | 15,000 ₹30,000 Lowest | 15,000 ₹30,000 Lowest | 17,500 ₹35,000 |
| 8.00 | Replacement of damaged WTI of 05 M.V.A. Power Transformer with including all associated work as per requirement. | 2 | Job | 18,000 ₹36,000 | 15,000 ₹30,000 Lowest | 15,000 ₹30,000 Lowest | 19,500 ₹39,000 |
| 9.00 | Centrifuging of Transformer oil of 05 M.V.A. Power Transformer installed at 33/11 K.V. Sub-Station. | 2 | Job | 28,000 ₹56,000 | 50,000 ₹1,00,000 | 50,000 ₹1,00,000 | 27,500 ₹55,000 Lowest |
| 10.00 | Spray Painting of 05 M.V.A. (33/11 KV) T/F with one coat of red oxide primer and then two coat of synthetic enamel gray paint after cleaning of rust/dust including cost of all material labour and T&P. | 2 | Job | 18,500 ₹37,000 | 10,000 ₹20,000 Lowest | 19,000 ₹38,000 | 20,000 ₹40,000 |
Tender Value
₹3.7 L
EMD Value
₹3,730
Closing Date
29 May 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum Of Works Involved in Maintenance And Replacement of Old and Damaged Gaskets From Top Cover, Bushing And Other of 5 MVA Power Transformer At 33/11 KV S/S Makhi and Kashiram, Unnao Under the area of EDD-P.D. Nagar, Unnao.
2026_MVVNL_1135509_2
155/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
/CNo.3355002101008374,IFSCCodePUNB0335500
₹3,730
12 Jun 2026
21 May 2026
30 May 2026
21 May 2026
29 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Opening of H.V. side bushing connection of 05 M.V.A. Power Transformer with replacement of 03 Nos. damage bushing rod drain out of Transformer oil from main tank to empty oil tank/drums. | - | Job | 100 | - |
| 2 | Opening of L.V. side bushing/Neutral bushing connection of 05 M.V.A. Transformer with replacement of 03 Nos. damage bushing rod. | - | Job | 100 | - |
| 3 | Removal of damaged packing of LV side bushing/metal parts & replacement with new gaskets/metal parts, its fixing after proper cleaning. | - | Job | 100 | - |
| 4 | Removal of damaged packing of HV side bushing /metal parts & replacement with new gaskets/metal parts, its fixing after proper cleaning. | - | Job | 100 | - |
| 5 | Removal of damaged packing of neutral bushing & replacement with new gaskets, and fixing it after proper cleaning. | - | Job | 100 | - |
| 6 | Replacement of complete Top cover gasket by opening of all accessories, nuts bolts and other required completing the work satisfactorily. | - | Job | 100 | - |
| 7 | Replacement of damaged OTI of 05 M.V.A. Power Transformer with including all associated work as per requirement. | - | Job | 100 | - |
| 8 | Replacement of damaged WTI of 05 M.V.A. Power Transformer with including all associated work as per requirement. | - | Job | 100 | - |
| 9 | Centrifuging of Transformer oil of 05 M.V.A. Power Transformer installed at 33/11 K.V. Sub-Station. | - | Job | 100 | - |
| 10 | Spray Painting of 05 M.V.A. (33/11 KV) T/F with one coat of red oxide primer and then two coat of synthetic enamel gray paint after cleaning of rust/dust including cost of all material labour and T&P. | - | Job | 100 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
Retender of Tender no. 155.pdf
Tender Documents • 0.28 MB
doc155.pdf
Tender Documents • 1.39 MB
BOQ_2156527.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .