Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹62.4 LAccepted-AOC ANANT IMAGINE APARTMENT OLD BUS STAND KORBA C G 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹59.3 L+₹6.4 L (12.1%)Rejected-Finance | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹68.6 L+₹15.7 L (29.7%)Rejected-Finance 3 KANHA HERITAGE RING ROAD 2 BILASPUR CHHATTISGARH 495001 | BILASPUR | BILASPUR | CHHATTISGARH | 495001 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹1.4 Cr+₹88.2 L (166.7%)Rejected-Finance 1ST FLOOR FLAT NO A 104 ANANT EMEGINE PURANA BUS STAND KORBA CHHATTISGARH | KORBA | KORBA | CHHATTISGARH | 495678 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
20 Jun 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Day-to-day diversion, shifting and extension of HT overhead Lines of East Section Quarry (Malgaon, Old Dipka and Old Hardi-bazar road areas) for a period of one year at Dipka Expansion Project.
2024_SECL_309563_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/19 dtd-31/05/24
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
6 documents required · 6 mandatory
₹2.5 L
8 Oct 2024
3 Jun 2024
22 Jun 2024
3 Jun 2024
20 Jun 2024
4 Jun 2024
3 Jun 2024 - 13 Jun 2024
Amount
Transportation of poles loading onto departmental truck from stockyard, unloading from truck and shifting from road side to pole pit
Shifting of materials other than poles from stockyard to pole pit
Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting with OB stone boulder without cement, sand and stone aggregate etc., as required.
Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting by OB Boulder and cement, without sand and stone aggregate.
Erection of stay set complete : Supply of GI stay set, 5/8" X 5 feet, along with all accessories and fixing of stay set with stay insulator including excavation for stay pit and grouting by OB, Boulder and cement
Erection of disc/pin insulator for 11 KV over head lines as required
Supply and erection of 11 KV grade Polymer disc insulator, ball and socket type, 70 KN for 11 KV overhead lines as required.
Supply and erection of 11 KV grade Polymer pin insulator, ball and socket type, 10 KN for 11 KV overhead lines as required.
Supplying of 3U bolt, ball and socket type tension hardware suitable for 11 KV disc insulator.
Dismantling of 9/11/13 m pole with bracket etc.
Dismantling of overhead line comprising of ACSR DOG conductor, GI Wire, cross arms, insulators etc as required.
Dismantling of overhead line comprising of ACSR WOLF conductor, GI Wire, cross arms, insulators etc as required.
Stringing of DOG conductor, including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering.
Stringing of WOLF conductor, including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering.
Laying & Stringing of earth wire including supply of 8 SWG/4 mm G.I wire.
Erection of cradle guarding including supply of 8 SWG/4 mm G.I wire, fabrication of the cradle guard and fixing onto guarding channels.
Supplying and fixing of MS nut bolt of different size as required.
Fabrication of MS Channel/Angle/Flat for bracket or clamp as per requirement.
Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos.
Total impact of GST for the purpose of CTC
RRES-VRE (JV)
POWERTEK INDIA
AARNA Constructions
techsummary_320759.pdf
PDF • 2.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_320759.pdf
PDF • 2.06 MB
LOA19.pdf
PDF • 2.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .