Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC MOIRA BALIBANKER MAHIRA MOIRA COLLIERY PASCHIM BURDWAN PASCHIM WEST BURDWAN BARDHAMAN 713303 WEST BENGAL INDIA | PASCHIM BURDWAN | PASCHIM BURDWAN | WEST BENGAL | 713303 | ₹1.3 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹1.3 LRejected-Finance STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹1.3 L | L2 | Rejected-Finance TC recommendation |
| 3 | L3₹1.3 LRejected-Finance STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | ₹1.3 L | L3 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | ANNAPURNA ENTERPRISE L3 | DUTTA ENGINEERING WORKS L2 | GENA DEVI ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00Discription of items | ||||||
| 2.00 | S.E. Copper wire | 90 | kg | 992 ₹89,280 | 985 ₹88,650 | 979 ₹88,110 |
| 3.00 | Dismantling of motor withdrawing of burnt out/old winding from motor slots & cleaning decarbonizing of stator & rotor | 1 | ls | 4,650 ₹4,650 | 4,580 ₹4,580 | 4,400 ₹4,400 |
| 4.00 | Stripping motor damaged copper conductor. | 1 | ls | 2,550 ₹2,550 | 2,450 ₹2,450 | 2,420 ₹2,420 |
| 5.00 | New coil formation & refitting of the coil in the slot (winding charges) 15% of S.E. Copper wire | 1 | ls | 16,250 ₹16,250 | 15,950 ₹15,950 | 15,840 ₹15,840 |
| 6.00 | Insulating materials (Tape, tubes, coil separator, wedges & midstick) 15% of S.E.Copper wire | 1 | ls | 16,250 ₹16,250 | 15,950 ₹15,950 | 15,840 ₹15,840 |
| 7.00 | Painting of motor with nuts, bolts, washer & other hardware materials | 1 | ls | 1,825 ₹1,825 | 1,785 ₹1,785 | 1,760 ₹1,760 |
| 8.00 | Flexible glass cable for termination connection & jumpering | 1 | ls | 8,950 ₹8,950 | 8,700 ₹8,700 | 8,580 ₹8,580 |
| 9.00 | Cost of broken bar brazing & grinding (Using Rupton rod) | 1 | ls | 450 ₹450 | 425 ₹425 | 412 ₹412 |
| 10.00 | Both sides bearing housing welding & machining as per bearing size | 1 | ls | 14,850 ₹14,850 | 14,500 ₹14,500 | 14,000 ₹14,000 |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
2 Feb 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete repairing and rewinding of C.G. make 150HP 1470RPM 550Volt Conveyor belt at Millennium Incline of Shankarpur Colliery under Bankola Area( Retender)
2026_ECL_351651_1
ECL/GM/BA/E TENDER/25-26/ENM/219(R01) Dt 23.01.2026
Open Tender
Electrical and Maintenance Works
25 days
Shankarpur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,900
23 Apr 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
23 Jan 2026 - 26 Jan 2026
S.E. Copper wire
Dismantling of motor withdrawing of burnt out/old winding from motor slots & cleaning decarbonizing of stator & rotor
Stripping motor damaged copper conductor.
New coil formation & refitting of the coil in the slot (winding charges) 15% of S.E. Copper wire
Insulating materials (Tape, tubes, coil separator, wedges & midstick) 15% of S.E.Copper wire
Painting of motor with nuts, bolts, washer & other hardware materials
Flexible glass cable for termination connection & jumpering
Cost of broken bar brazing & grinding (Using Rupton rod)
Both sides bearing housing welding & machining as per bearing size
Both side rotor shaft fixing & machining as per dimension.
Cost of new fan with material
transporting charges both side
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.26 MB
Tendernotice_3.pdf
PDF • 0.17 MB
BOQ_364416.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid