Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC HARDAHA BALUWA VARANASI CHANDAULE | ₹15.4 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹17.8 LRejected-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹17.8 L | L2 | Rejected-Finance Lowest II |
| 3 | L3₹18.4 LRejected-Finance DHANAURI KUNWAR POST AKBARABAD TEHSIL NAJIBABAD DISTRICT BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹18.4 L | L3 | Rejected-Finance Lowest III |
| 4 | Rejected-Technical VILL CHAMROLA NAGAL SOTI DISTT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | - | - | Rejected-Technical Due to incomplete documents as per tender conditions |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to incomplete documents as per tender conditions |
| Sl No | Description | Qty | Unit | ATUL KUMAR GUPTA L2 | M/S SHIV CONSTRUCTION L1 | VINEET KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete. | 228 | Cum | 52 ₹11,856 | 50 ₹11,400 | 62 ₹14,136 |
| 2.00 | Laying C.C-(M-10), 1:3:6 with cement, course sand and crushed Stone ballast 4mm to 20 & 20 mm to 40 mm (Graded). size mortar in foundation including cost of all material, labour,T&P etc. | 74.8 | Cum | 5,050 ₹3.8 L | 4,050 ₹3.0 L | 5,278 ₹3.9 L |
| 3.00 | Laying C.C-(M-25), 1:1.5:3 using size 4-10 mm & 10-20mm graded crushed aggregate including all cost of material, labour , T&P & Mechanical Mixing etc. for completion of work (per cum.) | 14.4 | Cum | 6,200 ₹89,280 | 4,750 ₹68,400 | 6,553 ₹94,363.20 |
| 4.00 | P/Laying Brick Ballast Including cost of all material, labour, T&P etc. for completion of work | 31 | Cum | 2,600 ₹80,600 | 2,000 ₹62,000 | 870 ₹26,970 |
| 5.00 | Brick work in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum) | 187 | Cum | 5,300 ₹9.9 L | 4,700 ₹8.8 L | 5,276 ₹9.9 L |
| 6.00 | Providing and laying Non pressure NP-2 class R.C.C pipes 1000 mm. Dia including collar jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 Cement : 2 Fine sand ) including testing of joints etc completed. | 60 | RM | 2,550 ₹1.5 L | 2,500 ₹1.5 L | 4,088.5 ₹2.5 L |
| 7.00 | Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM) | 313 | Sqm | 115 ₹35,995 | 100 ₹31,300 | 118 ₹36,934 |
| 8.00 | Finishing wall with two coat of water proof cement paint Weather coat of approved quality on new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work. | 313 | Sqm | 135 ₹42,255 | 120 ₹37,560 | 142 ₹44,446 |
Tender Value
₹18.5 L
EMD Value
₹38,000
Closing Date
4 Nov 2025, 2:00 pmClosed
Executive Engineer
EGCCD6 Najibabad
CONSTRUCTION OF INLET AT KM 6.500, 7.500 and 9.150 OF NAGINA BRANCH CUM ESCAPE
2025_UPIDC_1085704_17
03/EE/2025-26
Open Tender
Civil Works - Canal
90 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹354
₹38,000
23 Feb 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
28 Oct 2025 - 4 Nov 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
t3.pdf
Tender Documents • 1.40 MB
BOQ_1991048.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid