| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement |
| 2 | L2₹1.6 Cr+₹5.9 L (3.72%)Rejected-Finance | ₹1.6 Cr+₹5.9 L (3.72%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
2 Dec 2020, 3:00 pmClosed
O/O Project Director DRDA Thoothukudi
O/O Project Director DRDA Thoothukudi
Thoothukudi District - MRL 14-Singathakuruchi to Ulagudi AD Road in Karunulam Block under PMGSY III Batch I Package No TN 25-92
2020_RDTN_101578_1
TN2592
Open Tender
Civil Works - Roads
Item Rate
270 days
Thoothukudi District
As per tender schedule
4 documents required · 4 mandatory
₹0
₹3.2 L
O/O Project Director DRDA Thoothukudi
18 Feb 2021
23 Oct 2020
2 Dec 2020
23 Oct 2020
2 Dec 2020
20 Nov 2020
11 Nov 2020
Amount
MRL 14-Singathakuruchi to Ulagudi AD Road Road Km0/0-3/920 in Karunkulam Panchayat Union of Package No TN 25-92
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Scarifyingtheexistingbituminousroadsurfacetoadepthof100mmand disposalof scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Sub grade)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the intersticesof coarse aggregate, watering and compacting to the requireddensity Grading2 asper Technical Specification Clause 405. (WBM Grading II)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the intersticesof coarse aggregate, watering and compacting to the requireddensity Grading3 asper Technical Specification Clause 405. [3(A)] (WBM Grading III)
Providing and applying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii)
Providing, laying and rolling of Open-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Providing and laying Seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510. (ii) Bitumen (S-65)
Provision of rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Providing and fixing Name Board
Providing and fixing Logo Boards of PMGSY Project
Providing and fixing Sign Board (1 curve =2Nos)
Provision for Chevron Sign octogan Board (90cm)
Provision for Mandatory Sign Board
Provision for Reflector
Providing and fixing Citizen Information Boards of PMGSY Project
Providing and fixing Maintenance Board
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Kilometer Stone (Precast)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Hectameter Stone (Precast) 200m stone (precast)
Routine Maintenance after completion of work
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s Ram Constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .