Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.5 L+₹6,388.52 (0.56%)Rejected-Finance NOCHIPALAYAM AUTHUR PO KARUR 2 | L2 | Rejected-Finance Rejected |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
30 Jan 2024, 3:00 pmClosed
Additional Collectoer (Dev) ,DRDA Coimbatore
DRDA Coimbatore
Construction of 100000 litre capacity Sump at Pothiyampalayam H/O Naranapuram Panchayat in Annur Block under 15th CFC (BP) - 2023-24 Package no .129
2024_RDTN_409265_1
ROC no 896/2023/A2 Dated 09.01.2024
Open Tender
Civil Works
Item Rate
180 days
Annur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
23 Jul 2024
12 Jan 2024
30 Jan 2024
12 Jan 2024
30 Jan 2024
12 Jan 2024
Amount
1.Construction of 100000 litre capacity Sump at Pothiyampalayam H/O Naranapuram Panchayat
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by departmental Officers.
For Hard soil
For SDR soil
Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,complete and as directed by officers
Reinforced Cement concrete 1:1½:3 (One of cement, one and a half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Beyond 1.50m & upto 4.50m below GL
Upto 1.50m below GL
Upto 4.50m above GL from GL
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
For 0.00 to 3.30m (Plane Surface)
For 3.30m to 4.30m (Plane Surface)
For 0.00 to 3.30m (Curved Surface)
Supplying ,Fabricating and placing the RTS rod for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Supply ,Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials,fixing of MS clamps,Bolt and nuts etc., complete and as directed bu officers
Filling the foundation with conveyed gravel (other than sand) in layers of not more than 15cm tk, watering, well ramming, consolidating, complying with standard specification ana as directed by officers
Painting two coats with best Plastic Emulsion paint
Supply of openwell / sump submersible pump with ISI mark as per IS 14220 5 HP (200 lpm x 40m) including all cost and conveyance charges etc.
Cost and supply of 7.5 HP Panel Board
Provision Erection of submersible Motor
Provision for Extension of Pipe
Cost and supply of 63mm pvc 6KSC pipes
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by departmental Officers.
Laying and jointing of PVC pipes
Refilling the excavated earth
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.SELVARAJ
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .