Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.7 LAccepted-AOC | L-1 | Accepted-AOC First Lowest | |
| 2 | L-2₹23.5 L+₹76,741.14 (3.38%)Rejected-AOC 62 | LUCKNOW | UTTAR PRADESH | 226001 | L-2 | Rejected-AOC Second Lowest | |
| 3 | L-3₹23.6 L+₹87,684.79 (3.86%)Rejected-AOC 15 KASARAK MIRANPUR KATRA TILHAR SHAHJAHANPUR | SHAHJAHANPUR | UTTAR PRADESH | 242001 | L-3 | Rejected-AOC Third Lowest | |
| 4 | L-4₹23.7 L+₹95,821.20 (4.22%)Rejected-AOC MOHALLA BAZAR MIRANPUR KATRA SHAHJAHANPUR | SHAHJAHANPUR | UTTAR PRADESH | 242001 | L-4 | Rejected-AOC Fourth Lowest |
| Sl No | Description | Qty | Unit | SHEELA ENTERPRISES L3 | VRIDHHI ENTERPRISES L2 | JINDAL ASSOCIATES L4 | M/S VIGHNAHARTA ENTERPRISES AND CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Recharge Wells | |||||||
| 1.01 | Transportation of DC Rig machine | 1 | Job | 3,980 ₹4,696.4 | 3,950 ₹4,661 Lowest | 3,993 ₹4,711.74 | 26,300.67 ₹31,034.79 |
| 1.02 | Water supply charges for drilling | 3 | Job | 8,955 ₹10,566.9 | 8,889 ₹10,489.02 Lowest | 8,985 ₹10,602.3 | 37,872.96 ₹44,690.09 |
| 1.03 | Drilling of 350 mm dia bore well by suitable method including collection of sample of different strata including cost of equipment ,T&P etc, complete required for work . | 150 | RM | 85,800 ₹1,01,244 Lowest | 1,42,500 ₹1,68,150 | 86,100 ₹1,01,598 | 2,28,816 ₹2,70,002.88 |
| 1.04 | Development of bore well by 3 HP submersible pump. | 30 | Hr | 14,910 ₹17,593.8 | 14,820 ₹17,487.6 | 14,970 ₹17,664.6 | 14,202.3 ₹16,758.71 Lowest |
| 1.05 | Supplying ,assembling, and Lowering of 150 mm dia uPVC Casing Pipe (confirming IS:12818) assembly including labour charges etc all complete. | 99 | RM | 58,014 ₹68,456.52 | 57,618 ₹67,989.24 Lowest | 58,212 ₹68,690.16 | 1,09,494 ₹1,29,202.92 |
| 1.06 | Supplying ,assembling, and Lowering of 150 mm dia uPVC with Ribs (confirming IS:12818) assembly including labour charges etc all complete . | 45 | RM | 26,820 ₹31,647.6 | 26,640 ₹31,435.2 Lowest | 26,910 ₹31,753.8 | 60,596.55 ₹71,503.93 |
| 1.07 | Providing & fixing of 150 mm MS clamp for holding of MS pipe including neccesary nut & bolt of required size. | 3 | each | 4,473 ₹5,278.14 | 4,440 ₹5,239.2 | 4,488 ₹5,295.84 | 2,682.66 ₹3,165.54 Lowest |
| 1.08 | Supply and Installation of 150 mm dia B class MS air vent. | 3 | No. | 2,985 ₹3,522.3 | 2,964 ₹3,497.52 Lowest | 2,994 ₹3,532.92 | 5,838 ₹6,888.84 |
| 1.09 | Providing & filling of Pea Gravel of size 2 mm to 4 mm dia into bore well including cost of labour, material etc. required for proper completion of work. | 10.59 | Cum | 66,378.12 ₹78,326.18 | 2,647.5 ₹3,124.05 Lowest | 66,600.51 ₹78,588.6 | 24,510.56 ₹28,922.46 |
Tender Value
Refer Docs
EMD Value
₹47,500
Closing Date
31 Aug 2026, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer Ground water Department Division mechanical 6/3 C beli road prayagraj
Construction of roof top rain water harvesting System at Govt inter college Prayagraj
2026_UPGWD_1178219_1
02/RWH/PRYJ/2026-27
Open Tender
Civil Works - Others
Item Rate
60 days
Prayagraj
Please refer Tender documents.
4 documents required · 4 mandatory
₹854
₹47,500
18 Sept 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1Construction of Recharge Wells | ||||||
| 1.01 | Transportation of DC Rig machine | 1 | Job | 4,000 | ₹4,000 | 18% |
| 1.02 | Water supply charges for drilling | 3 | Job | 3,000 | ₹9,000 | 18% |
| 1.03 | Drilling of 350 mm dia bore well by suitable method including collection of sample of different strata including cost of equipment ,T&P etc, complete required for work . | 150 | RM | 574.62 | ₹86,193 | 18% |
| 1.04 | Development of bore well by 3 HP submersible pump. | 30 | Hr | 500 | ₹15,000 | 18% |
| 1.05 | Supplying ,assembling, and Lowering of 150 mm dia uPVC Casing Pipe (confirming IS:12818) assembly including labour charges etc all complete. | 99 | RM | 588.87 | ₹58,298.13 | 18% |
| 1.06 | Supplying ,assembling, and Lowering of 150 mm dia uPVC with Ribs (confirming IS:12818) assembly including labour charges etc all complete . | 45 | RM | 599.41 | ₹26,973.45 | 18% |
| 1.07 | Providing & fixing of 150 mm MS clamp for holding of MS pipe including neccesary nut & bolt of required size. | 3 | each | 1,498.84 | ₹4,496.52 | 18% |
| 1.08 | Supply and Installation of 150 mm dia B class MS air vent. | 3 | No. | 1,000 | ₹3,000 | 18% |
| 1.09 | Providing & filling of Pea Gravel of size 2 mm to 4 mm dia into bore well including cost of labour, material etc. required for proper completion of work. | 10.59 | Cum | 6,300 | ₹66,717 | 18% |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
02BIDRWH.pdf
Tender Documents • 2.62 MB
BOQ_2213983.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .