Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹5.7 LRejected-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹5.7 L | L3 | Rejected-AOC L3 |
| 4 | L4₹6.0 LRejected-AOC SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹6.0 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | RAJ KUMAR TYAGI L2 | SAINI CONTRACTORS L4 | MAHIPAL L1 | AJAY KUMAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. (A) By Hydrolic excavator /JCB / equivalent Capacity 25 cum/ Hour i.e.1000/25 | 5,100 | cum | 22.8 ₹1,16,280 | 29 ₹1,47,900 | 20.4 ₹1,04,040 | 2.86 ₹14,586 Lowest |
| 2.00 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. (A) By Hydrolic excavator /JCB / equivalent Capacity 25 cum/ Hour i.e.1000/25Extra for Slush And Lehal of Earth work Disposal of Slush lead up to 200 m etc Comptete | 3,490 | cum | 102.32 ₹3,57,096.8 | 29 ₹1,01,210 | 91.54 ₹3,19,474.6 | 26 ₹90,740 Lowest |
| 3.00 | Extra for Rough/partial Dressing of excavated earth/Silt i/c cost of labour, T&P etc complete for proper completion of work. | 5,100 | cum | 2.28 ₹11,628 | 27 ₹1,37,700 | 2.25 ₹11,475 | 2.06 ₹10,506 Lowest |
| 4.00 | Clearing Thick Bushes & Throney Jungle without uprooting with disposal | 7,775 | sqm | 2.51 ₹19,515.25 | 27 ₹2,09,925 | 2.25 ₹17,493.75 Lowest | 59 ₹4,58,725 |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
8 Jun 2026, 5:00 pmClosed
EE UDEYC, Saharanpur
Office of the EE UDEYC, Saharanpur
Clearance work of the internal Section of Daulatpur Drain between Km 0.000 to 3.218
2026_UPIDC_1156496_3
01/EE/UDEYC/2026-27
Open Tender
Civil Works
Item Rate
15 days
Daulatpur Drain
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,000
Office of the EE UDEYC, Saharanpur
27 Aug 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
8 Jun 2026
3 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. (A) By Hydrolic excavator /JCB / equivalent Capacity 25 cum/ Hour i.e.1000/25 | - | cum | - | - |
| 2 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. (A) By Hydrolic excavator /JCB / equivalent Capacity 25 cum/ Hour i.e.1000/25Extra for Slush And Lehal of Earth work Disposal of Slush lead up to 200 m etc Comptete | - | cum | - | - |
| 3 | Extra for Rough/partial Dressing of excavated earth/Silt i/c cost of labour, T&P etc complete for proper completion of work. | - | cum | - | - |
| 4 | Clearing Thick Bushes & Throney Jungle without uprooting with disposal | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
BOQ_2167009.xls
BOQ • 0.26 MB
BOOKLETPDF.pdf
Tender Documents • 3.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].