| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR | |
| 2 | L2₹30.7 L+₹59,900.20 (1.99%)Rejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S RAHUL TRADERS L1 | S S CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | 211.42 | Cum | 126 ₹26,638.92 Lowest | 129 ₹27,273.18 |
| 2.00 | Centering and shuttering in straight portion of C.C. pier and abutment. | 27.6 | Cum | 480 ₹13,248 Lowest | 490 ₹13,524 |
| 3.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 52.85 | Cum | 5,735 ₹3,03,094.75 Lowest | 5,853 ₹3,09,331.05 |
| 4.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 319.33 | Cum | 5,010 ₹15,99,843.3 Lowest | 5,114 ₹16,33,053.62 |
| 5.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 170.66 | Cum | 111 ₹18,943.26 Lowest | 113 ₹19,284.58 |
| 6.00 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | 23 | Cum | 674 ₹15,502 Lowest | 688 ₹15,824 |
| 7.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 3,776 | Cum | 274 ₹10,34,624 Lowest | 279 ₹10,53,504 |
Tender Value
₹31.4 L
EMD Value
₹3.1 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF CANAL FROM KM 1.154 TO KM 1.397 OF CHHACHERA MINOR.
2026_UPIDC_1128903_1
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
90 days
CHHACHERA
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹854
₹3.1 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches (a) Building and Other structure (ii) By Hydraulic/ Mechanical excavator | |||||
| 2Centering and shuttering in straight portion of C.C. pier and abutment. | |||||
| 3Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | |||||
| 4Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | |||||
| 5Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
| 6Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
| 7Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.55 MB
BOQ_2105644.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .