| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹30.7 LRejected-Finance NOT AVAILABLE | ₹30.7 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S RAHUL TRADERS L1 | S S CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | 211.42 | Cum | 126 ₹26,638.92 | 129 ₹27,273.18 |
| 2.00 | Centering and shuttering in straight portion of C.C. pier and abutment. | 27.6 | Cum | 480 ₹13,248 | 490 ₹13,524 |
| 3.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 52.85 | Cum | 5,735 ₹3.0 L | 5,853 ₹3.1 L |
| 4.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 319.33 | Cum | 5,010 ₹16.0 L | 5,114 ₹16.3 L |
| 5.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 170.66 | Cum | 111 ₹18,943.26 | 113 ₹19,284.58 |
| 6.00 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | 23 | Cum | 674 ₹15,502 | 688 ₹15,824 |
| 7.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 3,776 | Cum | 274 ₹10.3 L | 279 ₹10.5 L |
Tender Value
₹31.4 L
EMD Value
₹3.1 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF CANAL FROM KM 1.154 TO KM 1.397 OF CHHACHERA MINOR.
2026_UPIDC_1128903_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
CHHACHERA
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹854
₹3.1 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches (a) Building and Other structure (ii) By Hydraulic/ Mechanical excavator | |||||
| 2Centering and shuttering in straight portion of C.C. pier and abutment. | |||||
| 3Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | |||||
| 4Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | |||||
| 5Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
| 6Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
| 7Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.55 MB
BOQ_2105644.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid