| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-AOC | ₹9.2 Cr Quoted ₹9.8 Cr | L1 | Accepted-AOC The L1 bidder M/s. Thiru.S.K.SUBBAREDDIAR has submitted their final Negotiation. Hence accepted. |
| 2 | L2₹10.1 Cr+₹25.9 L (2.64%)Rejected-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | ₹10.1 Cr+₹25.9 L (2.64%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.2 Cr+₹43.1 L (4.40%)Rejected-Finance MALLAGUNDA | ₹10.2 Cr+₹43.1 L (4.40%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | RAM CONSTRUCTIONS L2 | LAKSHMI CONSTRUCTIONS L3 | KASTHURI SUBBAREDDIAR L1 |
|---|---|---|---|---|---|---|
| .10BRIDGE WORK | ||||||
| 1.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL. | 2,000 | Cum | 450 ₹9,00,000 | 500 ₹10,00,000 | 138 ₹2,76,000 Lowest |
| 2.00 | Earth work excavation in rock not requiring blasting and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION - FOOTING UNDER ABUTMENTS AND PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision). | 289.4 | Cum | 515 ₹1,49,043.06 | 525 ₹1,51,937.1 | 502 ₹1,45,280.81 Lowest |
| 3.00 | Earth work excavation in rock not requiring blasting (Soft Disintegrated Rock / Soft Rock) and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION - FOOTING UNDER ABUTMENTS AND PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision). | 2,563.69 | Cum | 650 ₹16,66,399.8 | 675 ₹17,30,492.1 | 637 ₹16,33,071.8 Lowest |
| 4.00 | Compacted Cement Concrete M35 (Design mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structting etc; complete as per Sections 2100 of MoRT&(H) Specifications (Fifth Revision) for LEVELLING COURSE BELOW FOOTING OF ABUTMENTS & PIERS as per sections 2010 of MoRT&H Specifications (Fifth Revision). | 52.59 | Cum | 10,316 ₹5,42,539.07 | 10,500 ₹5,52,216 | 10,124 ₹5,32,441.41 Lowest |
| 5.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per Section 1500, 1700 & 2100 of MoRT&(H) Specifications (Fifth Revision) for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per section 2100, 1500 & 1700 of MoRT&H Specifications (Fifth Revision). | 390.68 | Cum | 10,920 ₹42,66,269.28 | 11,000 ₹42,97,524 | 10,715 ₹41,86,179.06 Lowest |
| 6.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per Section 1500, 1700 & 2100 of MoRT&(H) Specifications (Fifth Revision) for FOOTING UNDER PIER as per section 2100, 1500 & 1700 of MoRT&H Specifications (Fifth Revision). | 324.17 | Cum | 11,120 ₹36,04,748.16 | 11,200 ₹36,30,681.6 | 10,909 ₹35,36,348.71 Lowest |
| 7.00 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND FOOTINGS UPTO TO TOP OF FOOTING as per cl.707.4.6 of IRC 78:2014 | 566.74 | Cum | 7,130 ₹40,40,827.68 | 7,200 ₹40,80,499.2 | 6,999 ₹39,66,585.26 Lowest |
| 8.10 | Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete,working at depths, hire charges for tools and plants including all other incidental charges, etc., complete for ABUTMENTS AND RETURN WALLS SUB STRUCTURE BELOW SILL LEVEL as per section 1500, 1700 & 2200 of MORT&H specifications (Fifth Revision). | 54.84 | Cum | 12,242 ₹6,71,290.07 | 12,300 ₹6,74,470.5 | 12,014 ₹6,58,787.69 Lowest |
| 8.20 | Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete,working at depths, hire charges for tools and plants including all other incidental charges, etc., complete for ABUTMENTS AND RETURN WALLS SUB STRUCTURE ABOVE SILL LEVEL as per section 1500, 1700 & 2200 of MORT&H specifications (Fifth Revision). | 230.67 | Cum | 13,465 ₹31,05,971.55 | 13,600 ₹31,37,112 | 13,215 ₹30,48,304.05 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
7 Oct 2025, 11:00 amClosed
Superintending Engineer
Office of the SE H, NRR, AR line Road, Tirunelveli-2
Construction of High Level Bridge at Km 0-10 of Athanoor -Milagunatham road in lieu of existing causeway
2025_HWAY_604887_1
TN.No.15_2025_26_Athanoor
Open Tender
Civil Works - Bridges
Item Rate
Thoothukudi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4.8 L
18 Nov 2025
18 Sept 2025
7 Oct 2025
18 Sept 2025
7 Oct 2025
18 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .