Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | KAURA ENGINEERING WORKSLikely winner L1₹27.5 LQualified 33 7 VILL BEHTA HAZIPUR KRISHNA VIHAR COLONY LONI GHAZIABAD UTTAR PRADESH 201102 | GHAZIABAD | UTTAR PRADESH | 201102 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹28.5 L+₹99,065.36 (3.60%)Qualified 01 GOPAMAU ROAD MURADPUR POST THAMRWA BIGHA RAMPUR HARDOI UTTAR PRADESH 241404 | HARDOI | UTTAR PRADESH | 241404 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹29.5 L+₹2.0 L (7.14%)Qualified | L3 | Qualified MSE, Category: General |
Tender Value
₹9 L
EMD Value
₹30,000
Closing Date
2 Jul 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Boiler Tube Fabrication
9480477
GEM/2026/B/7675259
Two Packet Bid
Labour charge for boiler roof front tubes screen tubes of 76 point 2 mm dia Dismantaling,Labour cha
Sultanpur, Uttar Pradesh
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
2 yrs
₹5 L
KISAN SAHKARI CHINI MILLS LTD SULTANPUR, KISAN SAHKARI CHINI MILLS LTD SULTANPUR, (Kisan Sahkari Chini Mills Ltd Sultanpur)
₹30,000
2 Jul 2026
17 Jun 2026
2 Jul 2026
30 days from bid end date (until 1 Aug 2026)
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | Labour charge for boiler roof front tubes screen tubes of 76 point 2 mm dia Dismantaling | 50 | Nos | Bhola Prasad Labour Charge For Boiler 228001,Sahkari Chini Mills Ltd. Sultanpur Roof Front Tubes Screen | 15 |
| 2 | Labour charge for boiler roof front tubes screen tubes of 76 point 2 mm dia Fabrication | 50 | Nos | Bhola Prasad Labour Charge For Boiler 228001,Sahkari Chini Mills Ltd. Sultanpur Roof Front Tubes Screen | 15 |
| 3 | Labour charge for boiler roof front tubes screen tubes of 76 point 2 mm dia Fitting of tubes | 50 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 4 | Labour charge for boiler drum to drum tubes of 63 point 5 mm OD Dismantaling | 622 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 5 | Labour charge for boiler drum to drum tubes of 63 point 5 mm OD Fabrication | 622 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 6 | Labour charge for boiler drum to drum tubes of 63 point 5 mm OD Fitting of tube | 622 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 7 | Labour charge for side wall tube size 76 point 2 mm Dismentalling | 18 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 8 | Labour charge for side wall tube size 76 point 2 mm Fabrication | 18 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 9 | Labour charge for side wall tube size 76 point 2 mm Fitting of tube | 18 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
| 10 | Super Heater Coil OD 44 point 55mm Dismentaling | 48 | Nos | Bhola Prasad 228001,Sahkari Chini Mills Ltd. Sultanpur | 15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9480477.pdf
GEM_BID • 0.13 MB
scope_signed_2026-06-17-12-50-41_a87198ed6035da7a8c7dfa39e801a017.pdf
BOQ • 0.42 MB
boilertubr_2026-06-17-12-50-41_8a250ad04622a5d7eaece83196758ecd.csv
BOQ • 0.00 MB
1781681474.xlsx
GEM_OTHER • 0.01 MB
SCOPE_8daa22f6-9d82-4120-86ed1781682185005_buycon47.cdgvvdup.up.pdf
GEM_OTHER • 0.42 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .