| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC 76 CRIPER ROAD KONNAGAR HOOGHLY | KONNAGAR | HOOGHLY | WEST BENGAL | L1 | Accepted-AOC LOWEST RATE | |
| 2 | L2₹36.1 L+₹12,565 (0.35%)Rejected-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹36.2 L+₹16,900 (0.47%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L3 | Rejected-Finance HIGH RATE | |
| 4 | L4₹36.3 L+₹31,715 (0.88%)Rejected-Finance ASANSOL | ASANSOL | L4 | Rejected-Finance HIGH RATE |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
23 Mar 2022, 6:00 pmClosed
Executive Engineer, Eastern Mech. Divn., PHED
P 16 INDIA EXCHANGE PLACE EXTN CIT ANNEXE BLDG KOL 73
Round the clock Operation Guarding of 1250 KVA, 11KV 415V Sub-Station, D.G. Set, Internal External lighting arrangement etc. other allied works at Water Treatment Plant under Surface Water Based WS Scheme, Northern Sector, Part II Nakashipara, Dis
2022_PHED_369732_4
WBPHED/EE/EMD/NIET/18/2021-22
Open Tender
Miscellaneous Works
Item Wise
365 days
P 16 INDIA EXCHANGE PLACE EXTN CIT ANNEXE BLDG KO
Please refer Tender documents.
6 documents required · 6 mandatory
₹80,000
31 Mar 2022
8 Mar 2022
25 Mar 2022
8 Mar 2022
23 Mar 2022
8 Mar 2022
Amount
Round the clock day to day Operation & guarding of installed internal & external electrification arrangement including compound lighting & periodical inspection of 1250KVA, 11KV/415V outdoor type Sub-Stations & equipments including of Battery Charger, Battery bank, HT 3 Panel, ACBs, P.F. correction device, lighting transformers, lighting equipment, LT MCC / panel, LT control / Distribution panel along with Electrical gadgets, valves, 63KVA DG set, compound lighting etc. round the clock including up-keepment of entire installation and sweeping charges at WTP premises under Surface Water Based W/S Scheme, Northern Sector, Part-II (Nakashipara) as per direction of EIC. Major Electro Mechanical machineries at the installation:- a) Electrical Sub-Stations 1250 KVA, 11KV/0.415KV outdoor type b) 63 KVA DG set c) HT 3 panel VCB Panel (800A) with relays d) Remote tap changer panel for transformer - 2nos. e) Lighting Transformers. f) LT MCC panel including all ACBs g) Battery bank & Battery charger unit h) Internal & entire external lighting arrangement including compound lighting etc. Period: 365 days.
Routine & Periodical inspection by Electrical Supervisor having valid Supervisor Certificate of competency from Directorate of Electricity (Licensing Board), Govt of West Bengal or under any other State, Govt of India along with Technician / Supervisor. Each visit should be recorded in the Log Book (with date & time) to be supplied by the Agency and kept in respective Station. The Supervisor required to have thorough / in depth inspection of all the Electrical appliances to ascertain the healthy / fault free operational condition of each equipments i.e. for sub-station, Actuators, Flow Level / pressure instruments, Gauges, Lighting system, DG set, hoisting arrangements, Exhaust Fans, HT VCB Panel & L T Panel Boards, Cables, Capacitors, Transformers, Battery and Battery Chargers, Chlorination system including safety management system in compliance to the guide line as mentioned in the NIT. The periodic chart in tabular format as per direction of the EIC and in comply to the specification enclosed herewith for the check points scheduled should be furnished to the Department All other necessary requirement to be executed along with Log Book, Mobil, Cotton waste, Broom, Torch,. Detergents, Liquid soaps, Gloves, Apron, Tools, Tackles, Terminals, Sockets, Fuses, Indicating Lamps, Gland packing etc. to be supplied by the Agency as and when required through out the whole period of 1 year.
Cleaning of contacts twice in a month in the LT Panel Board, HT Panel, Busbar, cleaning of all Terminal Sockets, Coils once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the Log Book with date including supply of new gland packing, fuses, cotton waste, indicating lamps etc. for 12 months.
Servicing, testing and calibration complete with submission of report (specify of set point) in compliance with the guide line as per specification for the ACBS, VCB, Transformer oil level, replacement of silica gel etc. checking complete, wiring, testing CTs, PTs, Relay testing and calibration, insulation check in the period of 12 months (twice in year)
Consumption of diesel for 63KVA capacity DG set @ 11 ltr./hr. including all carriage & storage for 365 days X 2hr. run/day i.e. 730 hours [Measurement must be as per actual running Hr/log book.]
Consumption of Mobil oil including all carriage & storage for the 63KVA DG set for 365days x 2hrs. run/day i.e. 730 Hrs. [Measurement must be as per actual running Hr/log book.]
(The operation & guarding of the installation will be guided by the enclosed terms and condition - Annexure - I)
Tarun Kumar Bhattacharya
DAS ENTERPRISE
GHOSH BROTHERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .