Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹265Admitted-Finance SEONI | SEONI | MADHYA PRADESH | 480661 | ₹265 | Admitted-Finance |
| 2 | ₹265.13Admitted-Finance UMARIA | ₹265.13 | Admitted-Finance |
| 3 | ₹314.47Admitted-Finance | ₹314.47 | Admitted-Finance |
| 4 | ₹319.90Admitted-Finance 18 HOUSING BOARD COLONY DR RADHA KRISHNAN WARD NO 17 BINJHIYA MANDLA M P 481661 | MANDLA | MADHYA PRADESH | 481661 | ₹319.90 | Admitted-Finance |
| 5 | ₹319.99Admitted-Finance | ₹319.99 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHARDA WIRE & STEEL PRODUCTS | Maa Industries | SR INDUSTRIES | REAL CEMENT PRODUCTS | HARIOM TRADERS |
|---|---|---|---|---|---|---|---|---|
| 1.00 | RCC FENCING POLES HIGHT 2.0 M
Type – Straight
Lenght – 2.00 m
Dimensions – Bottom 10x10 cm square, Top 8x8 cm square
Cement Concretc Mix – Cement, sand and metal ratio 1:2:4, with 12.5 nominal size coarse aggreate. Sand used should be free from clay and salt, concrete mix shall be conforming to grade M-15 of IS: 456:2000
Reinforcement – 4 round vertical bars of 6 mm diameter. 11 No of stirrups of 6mm diameter round MS bare 20 cm centre to center.
Hooks- 5 no. bottom hook should be provided 60 cm above the bottom of the pole. second at 82.5 cm, third hook at 112.5 cm, fourth hook at 150 cm, top and fifth hook at 195 cm from bottom.
Manufacturing- In order to ensure desired compressive strength, RCC fencing poles should be compacted with the help of platform vibrators. Surface should be uniform and free from voids. The concrete cover over the reinforcement should not be less than 1.5 cm | 1 | FOR RATE PER POLE | 319.9 ₹319.90 | 319.99 ₹319.99 | 314.47 ₹314.47 | 265 ₹265 | 265.13 ₹265.13 |
Tender Value
₹20 L
EMD Value
₹60,000
Closing Date
28 Apr 2026, 4:00 pmClosed
Office of the Divisional Forest Office Umaria
Office of the Divisional Forest Office Umaria
Item Supply of RCC Fencing Pole
2026_MPFD_497519_1
721
Open Tender
Miscellaneous Goods
DFO UMARIA
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,000
₹60,000
Office of the Divisional Forest Office Umaria
27 May 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
28 Apr 2026
7 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | RCC FENCING POLES HIGHT 2.0 M
Type – Straight
Lenght – 2.00 m
Dimensions – Bottom 10x10 cm square, Top 8x8 cm square
Cement Concretc Mix – Cement, sand and metal ratio 1:2:4, with 12.5 nominal size coarse aggreate. Sand used should be free from clay and salt, concrete mix shall be conforming to grade M-15 of IS: 456:2000
Reinforcement – 4 round vertical bars of 6 mm diameter. 11 No of stirrups of 6mm diameter round MS bare 20 cm centre to center.
Hooks- 5 no. bottom hook should be provided 60 cm above the bottom of the pole. second at 82.5 cm, third hook at 112.5 cm, fourth hook at 150 cm, top and fifth hook at 195 cm from bottom.
Manufacturing- In order to ensure desired compressive strength, RCC fencing poles should be compacted with the help of platform vibrators. Surface should be uniform and free from voids. The concrete cover over the reinforcement should not be less than 1.5 cm | - | FOR RATE PER POLE | - | - | item1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.39 MB
BOQ_598102.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid