Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
6 Jul 2023, 3:00 pmClosed
Pankaj Kumar Sharma
HQ, New Delhi
Consultancy Services as AE for Supervision of Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam
2023_NHIDC_758730_1
NHIDCL/MMLP Jogighopa/IWT Terminal/AE/221390/2023
Open Tender
Civil Works
Item Rate
Assam
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
MD NHIDCL
₹50,000
HQ, New Delhi
20 Jul 2023
21 Jun 2023
7 Jul 2023
21 Jun 2023
6 Jul 2023
1 Jul 2023
21 Jun 2023 - 26 Jun 2023
26 Jun 2023
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader Cum Senior Structural Engineer 1no. *18 + 1no. *60=78
Senior Geotechnical Engineer 1no. *14=14
Senior Hydrological Engineer 1no. *18=18
Sub-Professional Staff
Quality cum Material Engineer 2nos. *18 + 1no. *60 = 96
Quantity Surveyor 2no. *18=18
Lab Technician 2nos. *18 + 1no. *60 = 96
Support Staff (inclusive of per diem allowance)
Office Manager cum Accountant (2nos.*18+ 1no.*60)=96
Steno cum Computer Operator (2nos.*18+ 1no.*60)=96
Office Boy (2nos.*18+ 1no.*60)=96
Transportation (Fixed Costs)
Innova/scorpio or equivalent (not more than 3 years old) (1 no during Construction Period + 1 no during Maintenance period/DLP), (1*18 + 1*60)=78 Rate per month
Bolero or equivalent (not more than 3 years old) (2 nos during Construction Period + 1 no during Maintenance period/DLP), (2*18 + 1*60)=96 Rate per month
Motorboat (not more than 3 years old) (1 no during Construction Period + 1 no during Maintenance period/DLP), (1*18 + 1*60)=78 Rate per month
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
For 12 round trip to Employer's Head Office
For 12 round trip to Employer's regional office.
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
Main Office of min. area 200 sqm (1 no during Construction Period + 1 no during Maintenance period/DLP), (1*18 + 1*60)=78
Site Office of min. area 100 sqm (2 no during Construction Period) 2*18=36
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies during construction period and maintenance period 1*18 + 1*60 = 78
Drafting Supplies during construction period and maintenance period 1*18 + 1*60 = 78
Computer Running Costs during construction period and maintenance period 1*18 + 1*60 = 78
Domestic and International Communication during construction period and maintenance period 1*18 + 1*60 = 78
Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(15 No., Intel Core i5, 19’’ colour TFT, Cache-6MB, RAM-4 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 11, pre-loaded anti-virus etc.), laser printers (5 nos., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (5 nos., 1.5 Ton), Water Coolers (as required)etc.,
During Construction period for 1 no of office 1*18=18
During Maintenance /DLP period for 1 no of office 1*60=60
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Cost towards Equipments required to carry out the consultancy assignmentt
All necessary equipments, vehicles and materials required to carry out the consultancy assignment shall be consultant’s responsibility and cost of such equipment’s, vehicles and materials shall be included in the quote submitted by the consultant. No additional payments shall be made to the consultant.
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .