Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 CrAccepted-AOC BEHIND WATER WORKS ST NO 4 JAIN NAGRI ROAD ABOHAR | ₹1.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.6 Cr+₹6.3 L (4.09%)Rejected-AOC KOTHI NO 5 A BAGHI ROAD DASHMESH NAGAR FEROZPUR DISTT FEROZPUR | ₹1.6 Cr+₹6.3 L (4.09%) | L-2 | Rejected-AOC L-2 |
| Sl No | Description | Qty | Unit | M/s Khara Contractors L1 | LALIT KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Filling of Stone or Spall into Crates and Hand Packing i/c Supply of Boulder Stone with weight 18 Kg. - 40 kg. and Boulder Stone with weight upto 18 Kg. not exceeding 10% of total quantity of Boulder Stone i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc. Complete in all respect. | 4,556.57 | Cum | 2,142 ₹92,98,700.46 Lowest | 2,181 ₹94,68,004.53 |
| 2.00 | Weaving of Wire Netting for Wire Crates i/c binding sides & partitions to make Crates of 15 cm x 15 cm or 25 cm x 7.5 cm mesh i/c supply & carriage of M.S. Annealed Wire. | 22,618.94 | Sqm | 191 ₹37,58,551.48 Lowest | 210 ₹41,32,438.8 |
| 3.00 | Tipping of Wire Crates including equipment | 3,366.42 | Cum | 130 ₹4,14,622 Lowest | 143 ₹4,56,084.2 |
| 4.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and
transporting to the embankment locations with all lifts and leads for rural area avg lead 3km | 3,544.4 | Cum | 146 ₹5,27,792.92 Lowest | 146 ₹5,27,792.92 Lowest |
| 5.00 | Basic Rate of ordinary earth/clay taken from private land including compensation but excluding royalty | 3,544.4 | Cum | 64 ₹2,31,361.28 Lowest | 70 ₹2,53,051.4 |
| 6.00 | Supply of Stone or Spall for Pitching i/c Supply of Boulder Stone with weight 3.6 Kg. - 18 kg. i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc for pitching. Complete in all respect. On Level | 89.35 | Cum | 2,230 ₹1,99,250.5 Lowest | 2,270 ₹2,02,824.5 |
| 7.00 | Supply of Stone or Spall for Pitching i/c Supply of Boulder Stone with weight 3.6 Kg. - 18 kg. i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc for pitching. Complete in all respect. On Slope | 88.3 | Cum | 2,403 ₹2,09,133.09 Lowest | 2,447 ₹2,12,962.41 |
| 8.00 | Filling stone or spall On level. | 44.67 | Cum | 1,668 ₹74,509.56 Lowest | 1,698 ₹75,849.66 |
| 9.00 | Filling stone or spall On side slopes behind pitching. | 45.17 | Cum | 1,678 ₹73,009.78 Lowest | 1,709 ₹74,358.59 |
| 10.00 | Grouting With Bajri or Shingle | 291.69 | Sqm | 1,667 ₹4,82,596.5 Lowest | 1,697 ₹4,91,281.5 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
16 Apr 2026, 10:00 amClosed
XEN Ferozepur Drainage-Cum-Mining Division
XEN Ferozepur Drainage-Cum-Mining Division
Construction Of Flood Mitigation Structure over the left edge of river Sutlej at RD 6260 of advance Bundh 0-23260 at village Ruknewala Kalan Tehsil Zira, District Ferozepur
2026_WR_165115_14
TN1349
Open Tender
Civil Works
Item Rate
60 days
XEN Ferozepur Drainage-Cum-Mining Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3.2 L
12 Jun 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling of Stone or Spall into Crates and Hand Packing i/c Supply of Boulder Stone with weight 18 Kg. - 40 kg. and Boulder Stone with weight upto 18 Kg. not exceeding 10% of total quantity of Boulder Stone i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc. Complete in all respect. | - | Cum | - | - |
| 2 | Weaving of Wire Netting for Wire Crates i/c binding sides & partitions to make Crates of 15 cm x 15 cm or 25 cm x 7.5 cm mesh i/c supply & carriage of M.S. Annealed Wire. | - | Sqm | - | - |
| 3 | Tipping of Wire Crates including equipment | - | Cum | - | - |
| 4 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and
transporting to the embankment locations with all lifts and leads for rural area avg lead 3km | - | Cum | - | - |
| 5 | Basic Rate of ordinary earth/clay taken from private land including compensation but excluding royalty | - | Cum | - | - |
| 6 | Supply of Stone or Spall for Pitching i/c Supply of Boulder Stone with weight 3.6 Kg. - 18 kg. i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc for pitching. Complete in all respect. On Level | - | Cum | - | - |
| 7 | Supply of Stone or Spall for Pitching i/c Supply of Boulder Stone with weight 3.6 Kg. - 18 kg. i/c Carriage of Boulder Stone from Quarry to site of work including loading & unloading from quarry to site of work etc for pitching. Complete in all respect. On Slope | - | Cum | - | - |
| 8 | Filling stone or spall On level. | - | Cum | - | - |
| 9 | Filling stone or spall On side slopes behind pitching. | - | Cum | - | - |
| 10 | Grouting With Bajri or Shingle | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
SBD18NoSDMFWorks.pdf
Tender Documents • 1.68 MB
BOQ_334885.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .