| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.6 LAccepted-AOC AKALA JAJOOPUR BASTI | BASTI | BASTI | UTTAR PRADESH | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.6 L+₹715.50 (0.08%)Rejected-AOC N A | PALWAL | HARYANA | 121004 | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S KRISHNA CONSTRUCTION L1 | M/S MAHAJAN CONSTRUCTION AND SUPPLIER L2 |
|---|---|---|---|---|---|
| 1.00 | E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge. | 56.26 | Cum | 111.53 ₹6,274.68 Lowest | 111.53 ₹6,274.68 Lowest |
| 2.00 | Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge. | 12.3 | Cum | 7,100 ₹87,330 Lowest | 7,100 ₹87,330 Lowest |
| 3.00 | Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge. | 4.68 | Cum | 6,400 ₹29,952 Lowest | 6,400 ₹29,952 Lowest |
| 4.00 | Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge. | 7.5 | Cum | 6,914.7 ₹51,860.25 Lowest | 6,914.7 ₹51,860.25 Lowest |
| 5.00 | Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge. | 47.77 | Cum | 7,432.07 ₹3,55,029.98 Lowest | 7,432.07 ₹3,55,029.98 Lowest |
| 6.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.For bridge slab above 3.00m span.Workdone as per as per Drawing & direction of engineer-in-charge. | 45.81 | Sqm | 947.5 ₹43,404.98 Lowest | 947.5 ₹43,404.98 Lowest |
| 7.00 | Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge. | 12.48 | Cum | 9,000 ₹1,12,320 Lowest | 9,000 ₹1,12,320 Lowest |
| 8.00 | (Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge. | 0.86 | MT | 1,00,200 ₹86,172 Lowest | 1,00,300 ₹86,258 |
| 9.00 | Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. Workdone as per as per Drawing & direction of engineer-in-charge. | 1 | RM | 120 ₹120 Lowest | 120 ₹120 Lowest |
| 10.00 | Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge. | 11 | RM | 1,469 ₹16,159 Lowest | 1,469 ₹16,159 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,300
Closing Date
6 Mar 2023, 10:00 amClosed
EE ID UNNAO
OFFICE OF THE EE ID UNNAO
25- RECONSTRUCTION OF VRB AT JHALOTAR MR. KM 4.400
2023_UPIDC_778702_25
03/EE/2022-2023
Open Tender
Civil Works - Canal
Item Wise
20 days
UNNAO
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,266
₹17,300
15 Oct 2026
28 Feb 2023
6 Mar 2023
28 Feb 2023
6 Mar 2023
28 Feb 2023
Amount
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.For bridge slab above 3.00m span.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge.
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. Workdone as per as per Drawing & direction of engineer-in-charge.
Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge.
JOINT FILLER BOARD INCLUDING ALL COST OF MATTERIAL LABOUR T&P ETC as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
E/W IN MAKING APPROCH ROAD INCLUDING ALL COST OF METTRIAL LABOUR T&P ETC.
E/W IN REMOVING/CUTTING OF DIVERSION INCLUDING WITH ALL COST OF METTRIAL LABOUR T&P ETC.
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge.
Paint (Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard)
Painting chainage numbers on Parapet including cost of all material require.
M/S MAHAJAN CONSTRUCTION AND SUPPLIER
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .