Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.2 LAdmitted-Finance | -37.10% | ₹16.2 L | L1 | Admitted-Finance |
| 2 | L2₹19.0 L+₹2.9 L (17.6%)Admitted-Finance | -26.00% | ₹19.0 L+₹2.9 L (17.6%) | L2 | Admitted-Finance |
| 3 | L3₹20.8 L+₹4.6 L (28.6%)Admitted-Finance | -19.11% | ₹20.8 L+₹4.6 L (28.6%) | L3 | Admitted-Finance |
| 4 | L4₹22.4 L+₹6.3 L (38.9%)Admitted-Finance | -12.65% | ₹22.4 L+₹6.3 L (38.9%) | L4 | Admitted-Finance |
| 5 | L5₹22.5 L+₹6.3 L (39.1%)Admitted-Finance | -12.50% | ₹22.5 L+₹6.3 L (39.1%) | L5 | Admitted-Finance |
Tender Value
₹25.7 L
EMD Value
₹51,352
Closing Date
7 Sept 2026, 6:00 pmClosed
XEN IFC
Office of the Executive Engineer IFC Division Poonch
Flood Protection Work at Drungali Nallah including the local nallah near Mohalla Qasba Hill Awan
2026_IFC_314579_8
e-NIT No 13 of 2026-27 Dated 04-07-2026
Open Tender
Civil Works
Percentage
45 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN IFC POONCH
₹51,352
15 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | 187.3 | - |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | CUM | 371.15 | - |
| 3 | supply of stones | - | cum | 700 | - |
| 4 | Carriage of stones by 1 KM of MT | - | cum | 151.47 | - |
| 5 | Crates made of Mesh type 10x12 (D=100mm) Zn+PVC coated . Mesh wire diameter 2.70/3.70 mm (ID/OD) crates of sizes 6mx1.5x1.5 | - | m2 | 250 | - |
| 6 | Carriage of crates from an avg. lead of 230 km at site OF WORK. 76kg/crates | 1 | MT | 7,273.45 | ₹7,266.18 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.30 MB
BOQ_1087144.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .