| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹2.4 L (2.12%)Admitted-Finance | ₹1.2 Cr+₹2.4 L (2.12%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V.JANARTHANAN L1 | N.Premkumar L2 |
|---|---|---|---|---|---|
| 1.001.Providing 790 FHTC to Sirukadambur Habitation of Sirukadambur Panchayat | |||||
| 1.01 | Saddle Piece (63 x 20) | 790 | Nos | - | - |
| 1.02 | PVC MTA | 790 | Nos | - | - |
| 1.03 | GM 20mm Ferrule | 790 | Nos | - | - |
| 1.04 | 20 mm UPVC Pipe | 6,320 | Rm | - | - |
| 1.05 | 20 mm GI Elbow | 790 | Nos | - | - |
| 1.06 | 20 mm GI Coupling | 790 | Nos | - | - |
| 1.07 | 20 mm GI Pipe (0.9 + 0.60) | 1,185 | Rm | - | - |
| 1.08 | 20 mm GI Coupling | 790 | Nos | - | - |
| 1.09 | 20 mm GI Bend | 790 | Nos | - | - |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Aug 2020, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households in Sirukadambur and Palayakudi Village Panchayats in Sendurai Panchayat Union in Ariyalur District for the year 2020-21 in Package No TN 30-28
2020_RDTN_173347_1
2052/2020/A7,Dated.15.07.2020
Open Tender
Civil Works - Water Works
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹1.2 L
DRDA, Ariyalur
21 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
27 Jul 2020
Amount
1.Providing 790 FHTC to Sirukadambur Habitation of Sirukadambur Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
2.Providing Pipeline (Distribution) to Sirukadambur Habitation of Sirukadambur Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
3.Providing 159 FHTC to Sethalavadi Habitation of Sirukadambur Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
4.Providing Pipeline (Distribution) to Sethalavadi Habitation of Sirukadambur Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
5.Providing 214 FHTC to Palayakudi Habitation of Palayakudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
6.Providing Pipeline (Distribution) to Palayakudi Habitation of PalayakudiPanchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
7.Providing 226 FHTC to Kilimangalam Habitation of palayakudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
8.Providing Pipeline (Distribution) to Kilimangalam Habitation of Palayakudi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
9.Providing 252 FHTC to Valarakurichi Habitation of Palayakudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
10.Providing Pipeline (Distribution) to Valarakurichi Habitation of palayakudi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
11.Providing 84 FHTC to Savurikadu Habitation of Palayakudi Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
12.Providing Pipeline (Distribution) to Elaikadambur Habitation of Periyakurichi Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.Premkumar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
PriceBid28.pdf
Tender Documents • 0.12 MB
BOQ_207534.xls
BOQ • 0.42 MB
TechnicalBid28.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .