| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | ₹25.7 L | L1 | Accepted-AOC Financial bid accepted at the rate |
| 2 | L2₹25.7 LRejected-Finance | ₹25.7 L | L2 | Rejected-Finance Reject being highest rate |
| 3 | L3₹27.5 LRejected-Finance | ₹27.5 L | L3 | Rejected-Finance Reject being highest rate |
| 4 | L4₹30.5 LRejected-Finance | ₹30.5 L | L4 | Rejected-Finance Reject being highest rate |
| Sl No | Description | Qty | Unit | Subhash Chandra Contractor L4 | Shrishti Construction L2 | M/S SATYA NARAIN GUPTA THEKEDAR L3 | M/S AWADH CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in trenches for foundations and pipes cables etc in ordinary soil (loan clay or sand) including lift upto 1.5 m, lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer- in- charge with in a lead of 50m. | 5.62 | Cum | 100 ₹562 | 80 ₹449.60 | 90 ₹505.80 | 86 ₹483.32 |
| 2.00 | Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil. | 184.72 | Cum | 285 ₹52,645.20 | 100 ₹18,472 | 260 ₹48,027.20 | 232 ₹42,855.04 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars) | 9,383.49 | kg | 83 ₹7.8 L | 85 ₹8.0 L | 72 ₹6.8 L | 72 ₹6.8 L |
| 4.00 | Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface. | 180.9 | sqm | 194 ₹35,094.60 | 110 ₹19,899 | 190 ₹34,371 | 163 ₹29,486.70 |
| 5.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). | 28.36 | Cum | 430 ₹12,194.80 | 200 ₹5,672 | 390 ₹11,060.40 | 362 ₹10,266.32 |
| 6.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P | 50.51 | sqm | 550 ₹27,780.50 | 300 ₹15,153 | 500 ₹25,255 | 457 ₹23,083.07 |
| 7.00 | Centering & shuttering for R.C.C. work including all materials & T&P | 318.7 | sqm | 890 ₹2.8 L | 462 ₹1.5 L | 780 ₹2.5 L | 752 ₹2.4 L |
| 8.00 | R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work . | 51.99 | Cum | 6,130 ₹3.2 L | 5,800 ₹3.0 L | 5,800 ₹3.0 L | 5,189 ₹2.7 L |
| 9.00 | First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work. | 96.29 | cum | 5,720 ₹5.5 L | 5,300 ₹5.1 L | 5,300 ₹5.1 L | 4,756 ₹4.6 L |
| 10.00 | 12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work. | 1,237.18 | sqm | 155 ₹1.9 L | 100 ₹1.2 L | 135 ₹1.7 L | 125 ₹1.5 L |
Tender Value
₹32.2 L
EMD Value
₹65,000
Closing Date
15 Oct 2025, 1:00 pmClosed
EE Tubewell Division First Orai Jalaun
office of EE Tubewell Division First Orai Jalaun
CONSTRUCTION OF ASSISTANT ENGINEER RESIDENCE (TYPE IV) OF 3rd SUB DIVISION AT JALAUN CAMPUS
2025_UPIDM_1080040_4
1224 /T.w.d. fo/EE/25-26 date- 18-09-2025
Open Tender
Civil Works
120 days
ORAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹65,000
18 Dec 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid