| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.3 LAccepted-AOC NEAR WARD NO 15 CHHABRA COLONY NEAR NEW BYE PASS ASANDH 132039 HARYANA | KARNAL | HARYANA | 132039 | L1 | Accepted-AOC L1 | |
| 2 | L2₹97.0 L+₹4.7 L (5.12%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.0 Cr+₹9.5 L (10.3%)Rejected-Finance VPO BIGHANA TEHSIL ALEWA DISTT JIND | JIND | HARYANA | 126101 | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.1 Cr+₹19.7 L (21.4%)Rejected-Finance H NO 104 BASANT VIHAR KARNAL | KARNAL | HARYANA | 132001 | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.2 Cr+₹32.6 L (35.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
17 Mar 2020, 5:00 pmClosed
Executice EngineerProvincial Division No 1 Karnal
Executice Engineer Provincial Division No 1 Karnal
Construction of Brick Masonry side drain 90 persent Covered and 2 feet dia Hume Pipe on Kachwa app road Road ID 7298 Kachhwa to Zarifabad road Road ID 7297 in Karnal District
2020_HRY_119951_1
Construction of Brick Masonry side drain Cove
Open Tender
Civil Works
Works
90 days
Construction of Brick Masonry side drain 90 persen
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
Executive Engineer Provl Divn No 1 Karnal
₹2.0 L
Yes
14 Jan 2021
25 Feb 2020
18 Mar 2020
25 Feb 2020
17 Mar 2020
25 Feb 2020
Amount
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres.(HSR 6.6)
Cement Concrete 1:6:12 with stone aggregate 40mm nominal size in foundation and plinth (HSR 10.32)
Cement Concrete 1:4:8 with stone aggregate 40mm nominal size in foundation and plinth (HSR 10.39)
Cement Concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth (HSR 10.41)
Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with Horizontal, excluding steel reinforcement but including centering and shuttering, laid in position complete in all respect extra over Item Nos. 10.79 to 10.94, if 1:1 ½:3 mix is used, instead of 1:2:4. {HSR 10.82 + 10.95 (a)}
First class brick laid in cement sand mortar 1:5 in foundation and plinth (HSR 11.3)
First class brick laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
12 mm thick cement plaster 1:4 (HSR 15.5)
Cement pointing 1:2 deep variety on brick and tile work (HSR 15.60)
Steel reinforcement TMT bars FE-500 EQR / FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights / depths / storey’s / basements etc. Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 18.22)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note: - Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released. Note:- In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR. the unit and nomenclature given in HSR Shall be applicable. ii) In case of any difference in the unit of any Non- schedule items depicted in this DNIT and the Conventional unit of that N.S Item as per practice in this department the conventional unit as per practice shall be applicable.
KASHISH INTERNATIONAL
Sh. Amit Sharma Contractor
Vardaan Construction
Sh. Ram Kumar
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .