Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | +0.00% | ₹12.0 L | L1 | Admitted-Finance |
| 2 | L2₹12.1 L+₹12,011.46 (1.00%)Admitted-Finance | +1.00% | ₹12.1 L+₹12,011.46 (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹12.3 L+₹24,022.92 (2.00%)Admitted-Finance | +2.00% | ₹12.3 L+₹24,022.92 (2.00%) | L3 | Admitted-Finance |
Tender Value
₹12.0 L
Closing Date
11 Aug 2026, 6:55 pmClosed
Sarpanch Gramsevak Grampanchayat Vanjarwadi
Grampanchayat Vanjarwadi Tal Karmala Dist Solapur 413203
Supply Material For Work Constructing WBM Road Kuranwadi To Sharad Kekan Wasti
2026_SOLAP_1323583_1
E-Tender/2026-27/02
Open Tender
Miscellaneous Works
Percentage
180 days
Vanjarwadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Exempted
13 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 943.2 | Cubic Metre | 139 | ₹1,31,104.8 |
| 2 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetre to 30 centimetre, breaking clods, dressing to the required lines, curves, grade and section, watering and compacting to 97 percent of standard proctor density for a lead of over 50 metres to 300 metres inclusive from the site of excavaion to the site of deposition, as directed | 943.2 | Cubic Metre | 195 | ₹1,83,924 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification inciuding spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading I Using Screening type-A | 136.13 | Cubic Metre | 2,727.7 | ₹3,71,321.8 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B | 123.75 | Cubic Metre | 2,679.35 | ₹3,31,569.56 |
| 5 | GST 18% | 1 | Number | 1,83,225.62 | ₹1,83,225.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2267006.xls
BOQ • 0.22 MB
corg.pdf
PDF • 0.36 MB
corg.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .