| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAdmitted-Finance 245 NO 9 1ST FLOOR ASR COMPLEX TRICHY MAIN ROAD DADAGAPATTY SALEM 636 006 | SALEM | SALEM | TAMIL NADU | 636006 | ₹17.0 L | L1 | Admitted-Finance |
| 2 | L2₹17.1 LAdmitted-Finance | ₹17.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VIMALA ENTERPRISES L1 | PRAGATHESH ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Formation of Reinforced Cement Concrete road along 370 E from Ch.0.00m to Ch.68.00m (Reach- I) | |||||
| 1.01 | Providing and forming of road using mil reject and wet ash in the mix proportion of 90% of mill reject and 10% of wet ash collected from NCTPS-I for filling the pot holes including all lead, lift mixing and laying consolidation using power roller and compacted as directed by engineer at site. (Mill reject and wet ash will be issued at free of cost by the department). | 143 | cum | 240 ₹34,320 | 245 ₹35,035 |
| 1.02 | Plain cement concrete 1:4:8 using 20mm HBG metal including cost of all materials, lead, lift, labour charges, curing, etc, complete. | 48 | cum | 6,270 ₹3,00,960 | 6,300 ₹3,02,400 |
| 1.03 | Providing and placing RCC 1:2:4 using 12 to 20 mm HBG metal including shuttering charges, cost of all materials, labour, lead, lift and mixing charges excluding the cost of reinforcement etc, complete. | 87.5 | cum | 9,080 ₹7,94,500 | 9,120 ₹7,98,000 |
| 1.04 | Supplying, cutting, bending, lapping and placing in position of steel reinforcement including binding with 18 G soft annealed block wire, all materials labour, lead, lift, etc., complete. | 6,125 | kg | 93 ₹5,69,625 | 94 ₹5,75,750 |
| 1.05 | Supplying and placing in position of joint filler in between concrete joints using preformed bitumen impregnated fiber board to a thickness of 25 mm and sealing with hot bitumen sealing compound as top filler including the cost of all materials, labour, lead, lift etc., complete | 4.5 | sqm | 193 ₹868.5 | 200 ₹900 |
Tender Value
₹20.2 L
EMD Value
₹20,100
Closing Date
23 Dec 2025, 2:00 pmClosed
SE/CM/NCTPS-I
NCTPS-I Chennai-120
Formation of Reinforced Cement Concrete road along 370 E from Ch.0.00m to Ch.68.00m (Reach_ I)
2025_EB_630024_1
CE /NCTPS-I/SE/ CM/134/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-1
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹20,100
Yes
9 Mar 2026
8 Dec 2025
24 Dec 2025
8 Dec 2025
23 Dec 2025
8 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
Name of Work: NCTPS –I- CM Circle – CM-I- Formation of Reinforced Cement Concrete road along 370 E from Ch.0.00m to Ch.68.00m (Reach- I)
Contract No: CE/SE/CM/NCTPS-I/134/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Formation of Reinforced Cement Concrete road along 370 E from Ch.0.00m to Ch.68.00m (Reach- I)
1.01 Providing and forming of road using mil reject and wet ash in the mix proportion of 90% of mill reject and 10% of wet ash collected from NCTPS-I for filling the pot holes including all lead, lift mixing and laying consolidation using power roller and compacted as directed by engineer at site. (Mill reject and wet ash will be issued at free of cost by the department). Item 1 143 cum Excess(+) Full Conversion INR
1.02 Plain cement concrete 1:4:8 using 20mm HBG metal including cost of all materials, lead, lift, labour charges, curing, etc, complete. Item 2 48 cum Excess(+) Full Conversion INR
1.03 Providing and placing RCC 1:2:4 using 12 to 20 mm HBG metal including shuttering charges, cost of all materials, labour, lead, lift and mixing charges excluding the cost of reinforcement etc, complete. Item 3 87.5 cum Excess(+) Full Conversion INR
1.04 Supplying, cutting, bending, lapping and placing in position of steel reinforcement including binding with 18 G soft annealed block wire, all materials labour, lead, lift, etc., complete. Item 4 6125 kg Excess(+) Full Conversion INR
1.05 Supplying and placing in position of joint filler in between concrete joints using preformed bitumen impregnated fiber board to a thickness of 25 mm and sealing with hot bitumen sealing compound as top filler including the cost of all materials, labour, lead, lift etc., complete Item 5 4.5 sqm Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_753424.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid