Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
14 Oct 2026, 2:00 pm
CE/NCTPS-II
Office of CE/NCTPS-II Chennai-120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to Financial controller room Accounts section and DSP office building
2026_EB_708789_1
CE/NCTPS-II/SE/CM/13/2026-27
Open Tender
Civil Works
Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
Yes
28 Sept 2026
28 Sept 2026
15 Oct 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing and refixing the existing powder coated anodized aluminium partly Plain glazed partition works using the same materials and new materials such as rubber beedings, screws, aluminium angles etc., including cost of all materials, labour charges, all leads, lifts, T&P etc., complete and as directed by the Engineer incharge of the work | 34.9 | m2 | - | - |
| 2 | Dismantling the existing false ceiling with careful removal of board panels, and cutting the aluminium grid and stacking the dismantled materials complete and as directed by site Engineer incharge of the work. | 52.1 | m2 | - | - |
| 3 | Providing two legged scaffolding for False Ceiling, brick work, plastering and painting using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails. | 677.6 | m2 | - | - |
| 4 | Brickwork in CM 1:5 using Fly ash bricks including cost of all materials, labour charges, lead, lift etc., complete. | 1.7 | m3 | - | - |
| 5 | Providing form work for concreting at all elevations and below GL to give medium smooth finish using steel shutters including cost of all materials, labour lead, lift etc. complete. | 2.2 | m2 | - | - |
| 6 | Providing, cutting, bending, tying and placing in position for an overlap of atleast 10 dia including cost of all materials, RTS rods, lead, lift, transporting, binding wire, welding operation etc. complete as instructed by the Engineer at site | 13 | Kgs | - | - |
| 7 | Providing RCC 1:1.5:3 using O.P Cement and 12 to 20mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete. | 0.12 | m3 | - | - |
| 8 | Chipping the old damaged plastering and roughening the surface of walls including cost of all materials, labour, lead, lift, etc., complete. | 20.8 | m2 | - | - |
| 9 | Plastering with CM 1:3, 12mm thick including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by site Engineer incharge of the work. | 49.1 | m2 | - | - |
| 10 | Providing, fixing in position of 8mm thick Calcium Silicate Board with Aluminium powder coated Tee and angle section (Saint cobain) and supporting the false ceiling using 6mm MS rods/G.I wire with required with hold fast at 0.60m intervals. The rates including cost of all materials, labour, lead, lift, T&P, etc., complete and as directed by the site Engineer incharge of the work. | 51.6 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Spec13.pdf
Tender Documents • 0.78 MB
BOQ_851766.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .