Tender Value
₹13.2 L
EMD Value
₹14,000
Closing Date
1 Dec 2022, 3:00 pmClosed
Block Development Officer
Block Development Officer Kaveripakkam Block 632508
Rejuvenation of thamarai kulam ,desiliting and Deepending ,bathing ghat , Retining wall , baby pond and Step at cheri panchayat Kaveripakkam Block, Ranipet District
2022_RDTN_265377_1
B2/2379/2022 date 14.11.2022
Open Tender
Civil Works
Works
90 days
Kaveripakkam Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,000
13 Dec 2022
18 Nov 2022
1 Dec 2022
18 Nov 2022
1 Dec 2022
18 Nov 2022
Amount
Kaveripakkam Block
Desilting and strengthening of Thamarai kulam at Cheri Panchayat
Clearing the scrub jungle, Julliflora Jungle and disposing of the same as directed by the Engineer incharge of works and as per technical specification [ specification 2.2]
Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
Total Earth work Quantity
Channel Earth Work Quantity
supply and fixing of RCC Boundry
Construction of Retaining wall for Baby Pond
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Batging Ghat , Steps ,outer plantform
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Steps Over Bund
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet Channel Structure I
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying suitable gravel and providing gravel packing 15cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work as directed by the Engineer in charge
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
venkatachalam
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .