Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.4 L
EMD Value
₹23,400
Closing Date
29 Oct 2026, 2:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer DEDC
Superintending Engineer DEDC
DEDC Providing 1 No 5 MVA transformer plinth LV breaker plinth cable duct fire protection wall and various structural plinth foundation and allied Civil works for enhancement of Power Transformer from 1X8 MVA to 1X8 1X5 MVA at Eachampadi
2026_EB_713159_1
02/2026-2027
Open Tender
Civil Works
Item Rate
dharmapuri EDC
As per BQR condition
2 documents required · 2 mandatory
₹0
₹23,400
Yes
12 Oct 2026
12 Oct 2026
30 Oct 2026
12 Oct 2026
29 Oct 2026
12 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for in hard gravelly soil | 30 | m3 | 100 | ₹3,000 |
| 2 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for In SDR (Not Requiring Blasting) | 20 | m3 | 10 | ₹200 |
| 3 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for In MR and DMR not requiring blasting | 20 | m3 | 10 | ₹200 |
| 4 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for In hard requiring blasting. | 10 | m3 | 10 | ₹100 |
| 5 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for Removal of hard rock by wedging and chiselling and trimming to proper shape | 20 | m3 | 10 | ₹200 |
| 6 | PCC 1:3:6 using 20 mm HBG metal for foundation including cost of cement without formwork all materials, labour, lead, lift etc. complete. | 9 | m3 | 10 | ₹90 |
| 7 | PCC 1:2:4 mix using 20 mm down graded HBG machine crushed metal for plinth foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. Without Form Work | 53 | m3 | 10 | ₹530 |
| 8 | PCC 1:2:4 mix using 20mm down graded HBG machine crushed metal for plinth foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. With form Work | 26 | m3 | 11 | ₹286 |
| 9 | RCC 1:1.5:3 using 12 to 20 mm machine crushed metal for control room footing concrete with formwork including cost of all materials, labour lead, litf, curing, etc., complete. Excluding the cost of steel reinforcement ( For fire protection wall Footing ) | 2 | m3 | 12 | ₹24 |
| 10 | RCC 1:1.5:3 using 12 to 20 mm machine crushed metal for control room column concrete with formwork upto base ment including cost of all materials, labour lead, litf, curing, etc., complete. Excluding the cost of steel reinforcement ( For fire protection column ) | 3 | m3 | 13 | ₹39 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_856681.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .