| 1 | L1₹2170.7 CrAdmitted-Finance | ₹2170.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2193.8 Cr+₹23.1 Cr (1.06%)Admitted-Finance 0 TOYO HOUSE LBS MARG KANJURMARG WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹2193.8 Cr+₹23.1 Cr (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹3861.5 Cr+₹1690.8 Cr (77.9%)Admitted-Finance | ₹3861.5 Cr+₹1690.8 Cr (77.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ThyssenKruup Industrial Solutions (India) Pvt. Ltd. L1 | Tecnimont Private Limited L3 | Toyo Engineering India Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Execution of complete scope of work on Lump sum turn Key basis as per the scope of the bidding documents which includes Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Site enabling jobs including grade filling and roads, Topography Survey and Soil Investigation, underground scanning, Demolition/ Dismantling of existing structures/Re-routing works as mentioned in the bid and co-ordination for the same with Owner/PMC, Complete Procurement (including first fill of lubricants, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares, replenishment of spares consumed during installation, pre-commissioning, commissioning and start-up activities & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Receipt, Handling & Storage of all Equipment, Materials, items including free issue equipment’s and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Plant Safety, Electrical and Instrumentation including tie-ins, Testing, calibration, Insulation and refractory works, Painting, Fireproofing, First fill of lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables, Lubricants for 6 (six) months of operation, Contract closure activities , OWNER/PMC punch points clearance of the GRASS ROOT POLY BUTADIENE RUBBER (PBR) PLANT OF CAPACITY 60 KTPA (PRODUCT BASIS) ALONG WITH ASSOCIATED FACILITIES as per Bidding document and Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation (soft and hard copies), supply of spares with necessary support and services during Defect Liability Period and supply of Tool & Tackles, Consumables, Lubricants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities For detailed scope, refer the relevant sections of the Bidding Document | ||||||
| 1.01 | FOREIGN CURRENCY PART | 1 | Lumpsum | 22,82,60,101.62 ₹22,82,60,101.62 | 37,42,63,469.15 ₹37,42,63,469.15 | 10,71,39,445.2 ₹10,71,39,445.2 Lowest |
| 1.02 | INDIAN CURRENCY PART | 1 | Lumpsum | 8,77,58,63,058 ₹8,77,58,63,058 Lowest | 15,53,90,69,799 ₹15,53,90,69,799 | 8,98,54,99,200 ₹8,98,54,99,200 |
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
21 Jul 2022, 2:00 pmClosed
AS PER NIT
AS PER NIT
EPCC 1 PACKAGE FOR GRASS ROOT POLY BUTADIENE RUBBER (PBR) PLANT OF CAPACITY 60 KTPA (PRODUCT BASIS) ALONG WITH ASSOCIATED FACILITIES AT IOCL PANIPAT REFINERY AND PETROCHEMICAL COMPLEX PANIPAT, HARYANA, INDIA
2022_REFHQ_148582_1
203168C/T/PBR/EPCC/01
Global Tenders
Lump Sum TurnKey
Lump-sum
973 days
PANIPAT
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 Cr
Yes
AS PER NIT
16 Nov 2022
9 Mar 2022
22 Jul 2022
9 Mar 2022
21 Jul 2022
27 May 2022
11 Apr 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Site enabling jobs including grade filling and roads, Topography Survey and Soil Investigation, underground scanning, Demolition/ Dismantling of existing structures/Re-routing works as mentioned in the bid and co-ordination for the same with Owner/PMC, Complete Procurement (including chemicals, catalysts, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Receipt, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Plant Safety, Electrical and Instrumentation including tie-ins, Testing, calibration, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months of operation, Contract closure activities of the GRASS ROOT POLY BUTADIENE RUBBER (PBR) PLANT OF CAPACITY 60 KTPA (PRODUCT BASIS) ALONG WITH ASSOCIATED FACILITIES as per Bidding document and Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during Defect Liability Period and supply of Chemicals, desiccant/adsorbent, Catalysts (other than free issue), Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities. | |||||
| 1.01 | FOREIGN CURRENCY PART | 1 | Lumpsum | - | - |
| 1.02 | INDIAN CURRENCY PART | 1 | Lumpsum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
VOL_1_TECHNOCOMMERCIAL_PART_I_II_PBR_UNIT.pdf
Tender Notice • 30.20 MB
BOQ_158837.xls
BOQ Document • 0.46 MB
93968293.pdf
Tender Document • 0.50 MB
CPMSL.pdf
Tender Document • 1.26 MB
Tender-Acceptance-Format.pdf
Tender Document • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Tender Document • 0.55 MB
Special_Instructions_to_the_Bidders_20220221_v1a.pdf
Tender Document • 1.26 MB
93968295.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .