| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹6.9 L+₹1.2 L (20.0%)Accepted-Finance | 2 | Accepted-Finance after reject L-1 for his incomplete documents | |
| 2 | 1₹5.8 LRejected-Finance | 1 | Rejected-Finance additional CDR not found | |
| 3 | 3₹7.4 L+₹1.6 L (27.9%)Rejected-Finance | 3 | Rejected-Finance being 3rd lowest | |
| 4 | 3₹7.4 L+₹1.6 L (27.9%)Rejected-Finance SMVDU | 3 | Rejected-Finance being 3rd lowest | |
| 5 | 4₹7.9 L+₹2.1 L (35.9%)Rejected-Finance LARRY THARAD TEHSIL UDHAAMPUR DISTRICT UDHAMPUR | 4 | Rejected-Finance being 4th lowest |
Tender Value
₹9.3 L
EMD Value
₹18,520
Closing Date
25 Jul 2022, 6:00 pmClosed
Executive Engineer Irrigation Division Udhampur
Executive Engineer Irrigation Division Udhampur
Improvement/Renovation of Punna Khul.
2022_IFC_179699_4
ENIT 14 of 2022-23 Dt18-07-2022
Open Tender
Civil Works
Item Rate
45 days
Udhampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Executive Engineer irrigation division Udhampur
₹18,520
25 Nov 2022
19 Jul 2022
26 Jul 2022
19 Jul 2022
25 Jul 2022
19 Jul 2022
Amount
Earth work in excavation by manual means over areas (exceeding 30cm and up to 1.5m in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated earth up to 1m from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil
Demolishing cement concrete manually / by mechanical means including disposal of material with 50 Mtr lead 1:3:6 or richer mix.
Providing and laying in position cement concrete 1:4:8 (1 cement: 4 fine sand: 8 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering. All work up to plinth level.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). Crushed
Dumping stones excluding cost of stones in horizontal on level.
Supply of stone boulders(nallah)nominal size 225 mm (Stack measurements reduced by 15%)
Centering and shuttering including strutting propping etc. and removal of form work for.Foundation, footing, bases of columns.
Centering and shuttering including strutting propping etc. and removal of form work for. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc.
12 mm cement plaster of mix 1:4 (1 Cement: 4 coarse sand).
Cement concrete flooring 1:2:4 (1 Cement : 2 Coarse sand: 4 graded stone aggregate finishing with floating coat of neat cement including cement slurry, but excluding the cost of noising of steps etc complete. 40mm thick with 20 mm nominal size stone aggregate, (crushed)
Carriage of Nallah Stones from source upto site of work. . Av. 600 mtr by Head Load.
Carriage of Sand from source upto site of work. B. Av. 150 Km by MT & 200 mtr by Head Load.
Carriage of Stones aggregate from nearest source upto site of work. Av. 90 Km by MT & 200 mtr By Head Load.
Provision for installation of Inauguration plate as well as construction of Pedestal (Complete job).
RAM MURTI
Om Parkash
Rajeev Kumar
VARUN MAGOTRA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .