| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | V.RADHAKRISHNAN&CO L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for dismantling of Jumpers and Droppers for single phase unit of 105MVA Auto Transformer .1No (Under LC Condition) | 8 | Each | 770 ₹6,160 |
| 2.00 | Oil Draining from transformer using filter machine/Oil pump/Hose Etc.,per Liter Excess Qty above 800 Liters-1-No | 12,000 | lit | 0.7 ₹8,400 |
| 3.00 | Loading of Empty Oil drum 60 Nos from store to Site K.R.Thopper 400KV SS .Mazdoor I Class | 4 | Each | 1,500 ₹6,000 |
| 4.00 | UnLoading of Empty Oil drum 60Nos at K.R.Thoppur400KV SS . Mazdoor Class 2 Nos | 4 | Each | 1,500 ₹6,000 |
| 5.00 | Labour charges for Loading of for 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from plinth . | 112.4 | MT | 770 ₹86,548 |
| 6.00 | Labour Charges for Dismantling of 1No of (single phase unit) of 105 MVA ,400/230KV Auto Transfromer and provision of suitable dummy plates for all opening such as HV bushing + turret, LV Bushing + Turret, all pipe lines and valves, Radiator in & out, including crane charges at k.r.Thoppur 400KVSS. | 1 | Each | 30,000 ₹30,000 |
| 7.00 | Labour charges for Pulling out/ Pulling in of 3Nos Power/Auto Transformer from to plinth to a distance of 20Mt approx. or as per actual including charge for all T&Ps for 3Nos of RYB Phase( single phase unit) of 66.67 MVA Auto Transfromer- at K.R.Thoppur 400KVSS(TON*MTR*RATE/MTE)= 112.4 X 20=2248 | 2,248 | MT/M | 32 ₹71,936 |
| 8.00 | Transporting of Empty Oil drum from Store to K.R.Thoppur 400KV SS . 60Nos With in 50kms | 2 | trip | 1,500 ₹3,000 |
| 9.00 | Labour charges for Loading of for 1No of ( single phase unit) of 105 MVA ,400/230kv Auto Transfromer- at K.R.Thoppur 400KV SS using suitable jacks as many times as required with or without accessories from safe place to truck.(Tonne*Rate) | 116.2 | per MT | 770 ₹89,474 |
| 10.00 | Labour charges for Transporting of 1No of ( single phase unit) of 105MVA 400/230KV Auto Transfromer- at K.R.Thoppur 400KV SS with all accessories from one substation to another substation by low bed truck and lorry to approximate distance of 100Kms.Including transformer Oil and with all accessories as directed by the Field Engineer. for first 100 Kms from K.R.Thoppur 400KVSS . | 1 | Nos | 1,74,000 ₹1.7 L |
Tender Value
Refer Docs
EMD Value
₹10,550
Closing Date
29 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_634842_1
LT-24/2025-26 of SE/GCC-II
Limited
Civil Works
120 days
Sunguvarchatram
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹10,550
Yes
14 May 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
Labour charges for dismantling of Jumpers and Droppers for single phase unit of 105MVA Auto Transformer .1No (Under LC Condition)
Oil Draining from transformer using filter machine/Oil pump/Hose Etc.,per Liter Excess Qty above 800 Liters-1-No
Loading of Empty Oil drum 60 Nos from store to Site K.R.Thopper 400KV SS .Mazdoor I Class
UnLoading of Empty Oil drum 60Nos at K.R.Thoppur400KV SS . Mazdoor Class 2 Nos
Labour charges for Loading of for 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from plinth .
Labour Charges for Dismantling of 1No of (single phase unit) of 105 MVA ,400/230KV Auto Transfromer and provision of suitable dummy plates for all opening such as HV bushing + turret, LV Bushing + Turret, all pipe lines and valves, Radiator in & out, including crane charges at k.r.Thoppur 400KVSS.
Labour charges for Pulling out/ Pulling in of 3Nos Power/Auto Transformer from to plinth to a distance of 20Mt approx. or as per actual including charge for all T&Ps for 3Nos of RYB Phase( single phase unit) of 66.67 MVA Auto Transfromer- at K.R.Thoppur 400KVSS(TON*MTR*RATE/MTE)= 112.4 X 20=2248
Transporting of Empty Oil drum from Store to K.R.Thoppur 400KV SS . 60Nos With in 50kms
Labour charges for Loading of for 1No of ( single phase unit) of 105 MVA ,400/230kv Auto Transfromer- at K.R.Thoppur 400KV SS using suitable jacks as many times as required with or without accessories from safe place to truck.(Tonne*Rate)
Labour charges for Transporting of 1No of ( single phase unit) of 105MVA 400/230KV Auto Transfromer- at K.R.Thoppur 400KV SS with all accessories from one substation to another substation by low bed truck and lorry to approximate distance of 100Kms.Including transformer Oil and with all accessories as directed by the Field Engineer. for first 100 Kms from K.R.Thoppur 400KVSS .
Labour charges for Transporting of 1No of ( single phase unit) of 105MVA Auto Transfromer-at K.R.Thoppurto 400KV Sunguvarchartram 400KV SS including transformer Oil and with all accessories from one substation to another substation by low bed truck and lorry to approximate distance of 320 Kms as directed by the Field Engineer. (320*6*116.2=223104)
Labour Charges for 400KV Class Bushing packing & Transporting from K.R.Thoppur 400KV SS approximate distance of 50KM
Labour Charges for 400KV Class Bushing packing & Transporting from K.R.Thoppur 400KV SS approximate distance of 370KM at Rs.40 for every additional kilometers . (370Km* 40Rs*2Tonne)
labour charges for un Loading of for 1No of ( single phase unit) of105 MVA Auto Transfromer- at Sunguvarchartram 400KV SS using suitable jacks as many times as required with or without accessories form truck to safe place.(Tonne*Rate)
Transist Insurance from K.R Thoppur to Sunguvarchartram 400KV SS
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_759660.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid