Tender Value
₹44.0 L
EMD Value
₹44,010
Closing Date
3 Sept 2024, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(V.Pt)
Block Development Office Vasudevanallur
Construction of 100000 litre OHT(12m staging height) at Devipattinam Village and Panchayat in Vasudevanallur Pt Union.
2024_RDTN_478426_1
BDOVSR/264/2024-b3-JJM NABARAD RIDF-2024-25
Open Tender
Civil Works
Works
180 days
Vasudevanallur
As Per Tender Documents
2 documents required · 2 mandatory
₹0
₹44,010
Yes
3 Sept 2024
29 Aug 2024
3 Sept 2024
29 Aug 2024
3 Sept 2024
29 Aug 2024
Amount
Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the Officers.
First depth of 2m
2 nd Depth
Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing.
R.C.C. 1:1.5:2(M30) (one cement one and half sand and two 20mm &10mm HBG stone) for Floor slab floor beam &side wall excluding the cost of reinforcement, centering and shuttering but including the cost of mixing, placing, vibrating of concrete curing and finishing etc., complete as directed by the officers.
For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
Below GL
Below& 3.30m ht from G.L
Above GL (+3.300 - +4.300m)
For Brace I
For Brace II
For Floor Beam and Bottm of Floor slab
CURVED SURFACE
For Side Wall, & Floor slab sides and Haunch
Above GL (+11.300 - +12.300m)
For Side Wall, Roof Slab sides
SQUARE COLUMN
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.30m to 11.55m )
Central circular column:
Column above 0 to 3.3m
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Providing MS Ladder & Hand rails arrangements in 1,00,000 Lits. Capacity OHT With 12.00m Staging Height.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Providing manhole cover of size 1x1 0.60 X 0.60 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
Supply & Delivery of following Pipes and specials for OHT connection
Supply of GI Pipes for OHT Connections 65 mm dia
65mm Ø GI Elbow
65mm Ø GI coupling
65mm Ø GI Flange Set
65mm Ø GM Gate valve
Rainwater Harvesting Structure and Platform
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B.
For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Pumping Main line Arrangements
Supply and Delivery of 90 mm dia 6 KSC PVC pipe line arrangments
90mmΦ PVC pipe
63 mmΦ PVC pipe
Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B.
Refilling excavated earth including all cost
Laying of PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testing.
90mmΦ PVC pipe
63 mmΦ PVC pipe
K.Pandithurai (BID ID -1127285)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .