Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-AOC | ₹7.9 Cr | L1 | Accepted-AOC PROPER |
| 2 | L2₹8.5 Cr+₹51.2 L (6.45%)Rejected-AOC 243 SURAVI PATH P O KAHILIPARA P S DISPUR | NAGAON | ASSAM | 782001 | ₹8.5 Cr+₹51.2 L (6.45%) | L2 | Rejected-AOC Not Qualified for AOC |
Tender Value
₹9.0 Cr
EMD Value
₹18.0 L
Closing Date
19 Feb 2020, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Reconstruction of breach embankment at Ch. 10.35km in Majirgaon area including improvement of B/dyke from Khanamukh to Majirgaon along with pro siltation measures
2020_DoWR_16161_1
GHY.EAST/2019-20/SOPD-FDR/II
Open Tender
Civil Works
Works
120 days
GUWAHATI
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
The Executive Engineer, Ghy. East W R Division
₹18.0 L
Yes
14 Mar 2020
29 Jan 2020
20 Feb 2020
29 Jan 2020
19 Feb 2020
7 Feb 2020
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% to 60 % of the area is covered by shrubs,trees etc.
Cutting bamboo, uprooting roots & stumps including removing them from the site of work, etc complete as directed.
Uprooting bamboo clumps where bamboo already removed including removing stumps to a distance as directed.
Felling trees including uprooting roots and stumps upto 50cm below ground, cutting into pieces and removing the same from the site of work as directed. Trees above 0.50m and upto 1m girth.
Felling trees including uprooting roots and stumps upto 50cm below ground, cutting into pieces and removing the same from the site of work as directed. Trees above 1m and upto 2m girth.
Cutting banana trees, uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage) For initial lead beyond 4 Km and up to 6.00 Km and for all lifts.
Compacting original ground supporting embankment. Loosening leveling and compacing original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
Labour for ramming with cast iron rammer to proper compaction including watering if necessary, etc. complete as directed.
Earthwork in bank trimming to the designed section /slope including removing the soils at a safe distance, complete as directed.
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-40 grade of cement concrete with graded broken course aggregates up to 12mm size down and reinforced with 4 Nos. of 4 mm dia high tensile steel wire cable at four corners with necessary cover and 4mm high tensile stirrups at 250mm C/C, in conformity with IS-6403 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia at 50 cm inside from both ends in the same face and in either face of post another 2 Nos. of holes of size 16 mm dia at 65mm inside from both ends including properly curing for 14 (fourteen) days and carriage of porcupine members from factory to the stack yard within a distance up to 100 Km complete as directed.
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) a) Launching without boat
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) b) Launching by boat
Carriage of Porcupine members by machine boat of 40.00 Qtl capacity including local carriage of porcupine members from stack yard to loading site up to a lead of 150m, loading , un loading at river bank near work site etc. complete as directed.(For lead up to 5.00 Km and for all lift)
Collection of sand gravel from approved quarry containing 60% sand and 40% gravel free from disintegrated and flaky pieces of vegetation and other deleterious matters, adherent coating etc. including stacking in suitable stacks at quarry site and payment of forest royalty etc. complete as directed.
Labour charge for laying of soling stone, brick bats, broken stone metal, sand gravel etc. on approach road including ramming dressing the seat and local carriage of materials up to a distance of 60 m complete as directed.
Construction of temporrary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart driven at atleast 0.75 m below ground and height above plint 2.5m. Split Jatti bamboo wall mud plastering white washing 2 coats, 10 cm thick touch roofing over bamboo rua frame pplacing at 0.15 m clear apart fitted with bamboo kamies from binding doors and windows with Bamboo Chattai strengthening with Bamboo frame binding with wire etc compple as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos/ Rm & Jati Bamboo at the rate of 61.00nos / Rm).
Bhaba Kanta Nath
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .