Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -20.30% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -17.10% | ₹1.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
21 Aug 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_320916_1
e-NIT No. 98 REW UDHAMPUR of 2026-27 Dated 13-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,000
Yes
27 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 10.35 | cum | 479.3 | ₹4,960.76 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 8.25 | cum | 592.9 | ₹4,891.43 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.2 Ordinary Rock | 2.06 | cum | 940.3 | ₹1,937.02 |
| 4 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 26.4 | sqm | 91.75 | ₹2,422.2 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 15.75 | cum | 2,793.8 | ₹44,002.35 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.22 | cum | 6,591.25 | ₹1,450.08 |
| 7 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.17 | cum | 4,826.5 | ₹15,300.01 |
| 8 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 14.02 | cum | 5,733.6 | ₹80,385.07 |
| 9 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 41.02 | Sqm | 286.35 | ₹11,746.08 |
| 10 | Carriage of Sand 50 Km by MT+500m AT | 8.26 | cum | 1,335.02 | ₹11,027.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1068618.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].