Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | ₹18.9 L Quoted ₹19.6 L | L1 | Accepted-AOC Ok |
| 2 | L2₹24.5 L+₹4.8 L (24.7%)Rejected-Finance RZ A2 2 CHANAKYA PLACE PART I OPP C 1A BLOCK JANAK PURI NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | ₹24.5 L+₹4.8 L (24.7%) | L2 | Rejected-Finance Lowest tenderer |
| 3 | L3₹25.9 L+₹6.3 L (32.1%)Rejected-Finance | ₹25.9 L+₹6.3 L (32.1%) | L3 | Rejected-Finance Other than lowest tenderer |
| 4 | L4₹26.6 L+₹6.9 L (35.4%)Rejected-Finance RZ 18 260 WEST SAGARPUR NEAR MCD SCHOOL NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | ₹26.6 L+₹6.9 L (35.4%) | L4 | Rejected-Finance Other than lowest tenderer |
| 5 | L5₹27.0 L+₹7.3 L (37.4%)Rejected-Finance N A | NEW DELHI | DELHI | 110001 | ₹27.0 L+₹7.3 L (37.4%) | L5 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹48.3 L
EMD Value
₹96,680
Closing Date
19 Feb 2022, 6:00 pmClosed
GE E/M BASE HOSPITAL DELHI CANTT
GE E/M BASE HOSPITAL DELHI CANTT-110010
REPAIR/ MAINT OF DX TYPE CENTRAL AC PLANT AND CONNECTED E/M WORKS AT BASE HOSPITAL UNDER GE (E/M) BHDC-10
2022_MES_502741_1
GE/BH-69/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE E/M BASE HOSPITAL DELHI CANTT
Class D Category c(i)
7 documents required · 7 mandatory
₹500
GE E/M BASE HOSPITAL DELHI CANTT
₹96,680
Yes
2 Apr 2022
20 Jan 2022
21 Feb 2022
20 Jan 2022
19 Feb 2022
5 Feb 2022
Amount
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor, compressor model:- SMC/4/65, Make:- Accel(R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning detergent, cotton waste, changing of compressor oil etc and cleaning the suction filter, oil filter, replacing the defective parts compete system for safe guard the gas with self pumping down system or with total recovery unit system incld. following operation complete all as specified & directed. (i) Charging of nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure/ leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R-22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi.... (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temp. as per require site. (v) Testing & commissioning of compressor after completion. Note:- (a) Spares of compressor shall be measured and paid separetely under respective item of this schedule (Sr. No 1.01 to1.22). (b) Any minor items required for overhauling except described here -in - after shall be supplied by the contractor with out any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates.
Supply only PISTON with PIN &Rings (ACCEL Part No. ASL6018R) complete all as specified and as directed.
Supply only CYLLINDER with suction valve (R-22) (ACCEL Part No. ASL6019A) complete all as specified and as directed.
Supply only OIL pump (ACCEL Part No. ASL6011A) complete all as specified and as directed.
Supply only Discharge valve assembly (R-22) (ACCEL Part No. ASL6020 A) complete all as specified and as directed.
Supply only Oil pressure regulation valve (ACCEL Part No. ASL6022 R) complete all as specified and as directed.
Supply only Set of gasket (ACCEL Part No. ASL6453) complete all as specified and as directed.
Supply only Set of neoprene 'O' RINGS (ACCEL Part No. ASL6454) complete all as specified and as directed.
Supply only Set of Dowty ring (ACCEL Part No. ASL6455) complete all as specified and as directed.
Set of SEALING RING (ACCEL Part No. ASL6456) complete all as specified and as directed.
Supply only SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and as directed.
Supply only HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed.
Supply only BEARING WITH BUSHING STD (ACCEL Part No. C-03) complete all as specified and directed.
Supply only DOWEL FOR BUSHING COLLAR (ACCEL Part No. C-17) complete all as specified and directed.
Supply only CONNECTING ROD ASSEMBLY (ACCEL Part No. ASL6017 A) complete all as specified and directed.
Supply only OIL STRAINER (ACCEL Part No. ASL6033 A) complete all as specified and directed.
Supply only CRANKSHAFT - FOR SMC/4/65 (ACCEL Part No. ASL6416 A) complete all as specified and directed.
supply only SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-65) complete all as specified and directed.
Supply only UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL6012A-1) complete all as specified and directed.
Supply only UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL6012A-2) complete all as specified and directed.
Supply only SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL6010 R) complete all as specified and directed.
Supply only SUCTION STOP VALVE ASSEMBLY (ACCEL Part No. ASL6025 A) complete all as specified and directed.
Supply only DISCHARGE STOP VALVE ASSEMBLY (ACCEL Part No. ASL6026 A) complete all as specified and directed.
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor, compressor model:- SMC/4/100, Make:- Accel (R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning detergent, cotton waste, changing of compressor oil etc and cleaning the suction filter, oil filter, replacing the defective parts compete system for safe guard the gas with self pumping down system or with total recovery unit system incld. following operation complete all as specified & directed. (i) Charging of nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure/ leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R-22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi.... (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temp. as per require site. (v) Testing & commissioning of compressor after completion. Note:- (a) Spares of compressor shall be measured and paid separetely under respective item of this schedule (Sr No. 3.01 to 3.20). (b) Any minor items required for overhauling except described here-in-after shall be supplied by the contractor with out any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates.
Supply only PISTON with PIN & Rings (ACCEL Part No. ASL1018R) complete all as specified and directed.
Supply only CYLLENDER with suction valve (R-22) (ACCEL Part No. ASL1019A) complete all as specified and directed.
Supply only OIL pump (ACCEL Part No. ASL1011A) complete all as specified and directed.
Supply only Discharge valve assembly (R-22) (ACCEL Part No. ASL1020 A) complete all as specified and directed.
Supply only Oil pressure regulation valve (ACCEL Part No. ASL1022 R) complete all as specified and directed.
Supply only Set of gasket (ACCEL Part No. ASL1453) complete all as specified and directed.
Supply only Set of neoprene ' O' RINGS (ACCEL Part No. ASL1454) complete all as specified and directed.
Supply only Set of Dowty ring (ACCEL Part No. ASL1455) complete all as specified and directed.
Supply only Set of SEALING RING (ACCEL Part No. ASL1456) complete all as specified and directed.
Supply only SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and directed.
Supply only HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed.
Supply only BEARING WITH BUSHING STD (ACCEL Part No. C-03) complete all as specified and directed.
Supply only CONNECTING ROD ASSEMBLY (ACCEL Part No. ASL1017 A) complete all as specified and directed.
Supply only OIL STRAINER (ACCEL Part No. ASL1033 A) complete all as specified and directed.
Supply only CRANKSHAFT - FOR SMC/4/100 (ACCEL Part No. ASL1416 A) complete all as specified and directed.
Supply only SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-100) complete all as specified and directed.
Supply only UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL1012A-1) complete all as specified and directed.
Supply only ULOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL1012A-2) complete all as specified and directed.
Supply only SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL1010 R) complete all as specified and directed.
Supply only BUSHING FOR PISTON PIN (ACCEL Part No. E-07) complete all as specified and directed.
S & F in repair oil pressure cut out for ACCEL MAKE compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson (Accel part no. V-11)
S & F in repair high pressure cut out for Accel make compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson (Accel part no. V-13)
S & F in repair low pressure cut out for Accel make compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson (Accel part no. V-12)
S & F in repair low pressure gauge/ oil pressure gauge for Accel make compressor of central type AC plant of any capacity as specified and directed. Make- Sporlene/ Danfoss/ Emerson (Accel part no. V-03)
S & F in repair high pressure gauge for Accel make compressor of central type AC plant of any capacity as specified and directed. Make- Sporlene/ Danfoss/ Emerson (Accel part no. V-04)
S & F in repair three way solenoid valve suitable for (Accel make compressor, compressor model-SMC/4/65 and SMC/4/100) central type AC plant of any capacity as specified and directed. Make of Solenoid valve Accel cat part no.U-1N or equivalent model of Sporlene/ Danfoss/ Emerson
S&F in repair CT Fan complete section Fan, Fan Dia-1400 mm , connected GI nutbolts and accessories all fitting sutiable for 90 TR cooling tower, CT Model-5061, CT Make-delta as per specified & directed by Engr-in-charge. FAN Make:- Kruger/ Nicotra/ Delta
S&F in repair CT Fan complete section Fan, Fan Dia-900 mm , connected GI nutbolts and accessories all fitting sutiable for 35 TR cooling tower, CT Model-5032, CT Make-delta as per specified & directed by Engr-in-charge. FAN Make:- Kruger/ Nicotra/ Delta
S & F in repair Expansion valve for central type AC plant all complete as specified and directed.(Expansion valve Make : Danfoss/ Emerson/ Sporlane (R-22) of following capacity:- (Sr No. 11.01 to 11.03)
Expansion valve for plant capacity 12/ 12.5TR
Expansion valve for plant capacity 30TR (cat part no. 107E in sporlane or equivalent model of Danfoss/ Emerson)
Expansion valve for plant capacity 40TR X3, (cat part no. 107E in sporlane or equivalent model of Danfoss/ Emerson)
M&L for repairing/ servicing incl. transportation to authorised workshop the centrifugal pump of following capacities by disconnecting the pump from motor, opening for inspection, replacing the worn out parts like gland bush, bearings, gland bolts and nuts, gland packing, gasket, water seal etc including repairing to pump shaft by remetalling, grinding, polishing and reassembling complete pump & refixing in same position & connecting including replacing the rusted nuts, bolts, washers etc and testing complete all as specified and directed by Engr-in-Charge (Srl No. 12.01 to 12.02)
Condenser or Chiller Pump of capacity 5 HP, Head Range-6-38M, LPS-7.4.
Condenser or Chiller Pump of capacity 10 HP, Head Range-6-38M.
Supply & charge the refrigerent R22 Gas. (Make:- Mafron/ Freon)
M & L in replacement underdeck insulation for metal roof with bonded fibre glass wool of density 24 Kg/Cum, 50 mm thick, suitably factory laminated with aluminium foil backed up by scrim and kraft paper (FSK), facing with 50 mm projection for overlap and butting comprising of the following all complete as directed and specified :- (insulating material shall conform to BS - 476, Part 4,5, 6 & 7):-“(a) Supply and fix 6 mm dia M S rods between purlins suitably for supporting the required thickness of insulation material beneath the metal roof.“(b) Supply and fix 22 SWG GI/Aluminium wires supports for insulation.“(c) Supply and fix chicken wire mesh 12.5 mm x 22 SWG of hexagonal construction below the insulation for supporting the same.
S & F in repair fully automatic star delta starter suitable for 3 phase, 415V, 15 HP rating induction motor, containing Electric over current protecton relay range 0.5 to 30 Amp with external CT 960 Amp, AC-3, 25 Amp rating contractor and back up protection HRC fuse of suitable rating etc all complete as specified and directed by Engr- in-Charge. Make: BCH Cat No.- NASKALEN or equivalent in SIEMENS/ ABB
S&F in repair single phase preventor Minilec VSP suitable for 3 phase supply 415 volt all complete as specified and directed.
S&F in repair 3 pole, ML3 contactor, 415 volt including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 25 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 18 including NO or NC auxiliary contact BLOCK, Coil voltage 230 V, 50 Hz including connecting complete as specified and directed.
S&F in repair 4 pole power contactor 415 V, type MNX 12 , 3 pole including NO or NC auxiliary contack Block, Coil voltage 230 V, 50 HZ including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 32 including NO or NC auxiliary contact block, coil voltage 230 V with including connecting complete as specified and directed.
S&F in repair 3 pole, ML2 contactor including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
S&F in repair 3 pole, ML6 contactor, 415 volt including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
M&L for descaling of condensser tube of central AC plant of cap 3x12TR by disconecting the condensser from the system, cleaninh by descaling pump of suitable capacity of 110 ' feet head using descaling solution of make Hibird or descaling solution, cleaning condenssor tube by nylon bursh & MS rod of suitable size, replacement of rubber joints and u/s nut bolts Note:- (i) Arrangment of T&P such as pump, tube, descaling solution shall be carried out by contractor. (ii) Descalling of all respective condensors are considered as one job.
All as per Ser items No 24 here-in-before but 3X12.5TR
All as per Ser items No 24 here-in-before but 3X40TR
All as per Ser items No 24 here-in-before but 3X30TR
S&F in repairs fan belt of Size B-81 complete as specified and directed Make: ECODRIVE/ DUNLOP/ Fenner
S&F in repairs fan belt of Size B-72 complete as specified and directed Make: ECODRIVE/ DUNLOP/ Fenner
S&F in repairs fan belt of Size B-68 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-76 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-98 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size C-108 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-70 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-60 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size A-62 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size complete as specified and directed B-85 Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size complete as specified and directed B-108/110 Make: FENEER/ ECODRIVE/ DUNLOP
Taking down the existing unserviceable sluice valve of size 100 mm dia, Supply and fixing new sluice valve of size 100 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed. Make- ZOLTA/ SANT/ KARTAR
Taking down the existing unserviceable butterfly valve of size 80 mm dia, Supply and fixing new butterfly valve of 80 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 65 mm dia, Supply and fixing new butterfly valve of size 65 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 50 mm dia, Supply and fixing new butterfly valve of size 50 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 100 mm dia, Supply and fixing new butterfly valve of size 100 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable stainer of size 80 mm dia, Supply and fixing new stainer of size 80 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
All as same of item No. 44 but size 50mm.
All as same of item No. 44 but size 100mm.
Checking the interlocking control and attending the compaint of control panel wiring of AC plant and making it fully serviceable with and including all size of wires, thimble, PVC, bakelight, connection plate Nut bolt, MCB, Indicator Lamp, MO NC block and other items. Note: (i) After intimation of breakdown by JE/ AGE E/M through telephone or verbally, the contractor should arrange the machanic to attend the complaint in side BHDC premisis within 2 hours and make them functional, if any item required the same shall be measured from particular item from schedule for complete work. (ii) If complaint intimation is done after 1600 hrs then complaint to be attented by contractor at 800 hrs next day. (iii) If contractor failer to attend complaint with in time frame, the recovery of Rs400/ Hrs will be implemented.
M&L for taking out compressor Motor (motor cap.:-20 HP, MAKE- CROMPTON, SEAMENS & ABB) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of suitable size including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
S&F in repair biametallic themal over load relay 9-14Amps complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 13-21 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 28-42 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 20-32 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
Taking out the existing unserviceable sprinklar of cooling tower and supply, installation, testing and commissioning of new sprinklar assembly for cooling tower as following as specified and as directed by Engr-in-Charge. Make- DELTA/ MIHIR/ UNIVERSAL.
M & L incl. transportation to authorsided workshop for taking out electric motor from the centrifugal pump set, opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding wire of size & discription to match with existing including insulating materials, varnishing and drying, reassembling, refixing in same position & connecting complete including testing and commissioning complete all as specified & directed (Sr No. 58.01 to 58.02)
Condenser or Chiller Pump of capacity 5 HP, Head Range-6-38M, LPS-7.4 , Make : Kirloskar
Condenser or Chiller Pump of capacity 10 HP, Head Range-6-38M, Make: Kirloskar
M&L for taking out compressor Motor (Motor cap-40 HP, MAKE-KIRLOSKAR) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . Opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Motor cap- 50 HP, MAKE-GENERAL ELECTRIC POWER INDIA) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Motor cap- 15 HP) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .