Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
1 Sept 2026, 3:00 pm5d left
Superintending Engineer (C and M)
Office of Superintending Engineer, Contracts and Monitoring, 4th Floor, CMWSS Board, No.1, Pumping Station Road, Chintadripet, Chennai 600 002
Construction of Depot 34 45 and 46 office building under Type B design at Various Location in Area IV
2026_CMWSS_694162_1
CNT/WSS/MWB/3767/2026-27
Open Tender
Civil Works
Percentage
180 days
Chennai
Class IA and IVB and above
5 documents required · 5 mandatory
₹0
₹58,000
14 Aug 2026
14 Aug 2026
2 Sept 2026
15 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Depot 34,45 and 46 office building under Type B design at Various Location in Area-IV | - | - | - | - |
| 2 | Construction of Depot 34 office building under Type B design at Various Location in Area-IV | - | - | - | - |
| 3 | Civil Works | - | - | - | - |
| 4 | Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil as per SS 20B with initial lead of 10m and lift of 2.0m | 65 | m3 | 145 | ₹9,425 |
| 5 | Supplying and filling sand for foundations and basement including watering consolidation, ramming etc., complete. | 14 | m3 | 1,981 | ₹27,734 |
| 6 | Refilling with excavated soils (other than sand) complying with standard specificatoins for filling in foundations and basement. | 54 | m3 | 50.4 | ₹2,721.6 |
| 7 | Cement concrete 1:3:6 (one cement, three sand, six aggregate) using 40mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming, curing etc., complete. | 10.5 | m3 | 6,111 | ₹64,165.5 |
| 8 | Cement concrete work 1:2:4 (one cement, two sand, four aggregate) using 20mm gauge hard broken stone jelly for reinforced concrete works excluding centering, shuttering and cost of steel reinforcement but including laying in position, compacting, curing, finishing etc. complete. | - | - | - | - |
| 9 | Upto Basement | 16 | m3 | 8,891 | ₹1,42,256 |
| 10 | Ground Floor | 17 | m3 | 8,891 | ₹1,51,147 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
CHECK_LIST_3767.pdf
Tender Documents • 0.55 MB
BOQ_834549.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].