Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAdmitted-Finance E 73 FF GALI NO 17B SADH NAGAR PALAM COLONY NEW DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | L1 | Admitted-Finance | |
| 2 | L2₹21.6 L+₹1.1 L (5.36%)Admitted-Finance GROUND FLOOR F 11 PHASE II MAYAPURI WEST DELHI DELHI 110064 | DELHI | WEST DELHI | DELHI | 110064 | L2 | Admitted-Finance | |
| 3 | L3₹21.7 L+₹1.2 L (5.77%)Admitted-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L3 | Admitted-Finance | |
| 4 | L4₹24.6 L+₹4.0 L (19.6%)Admitted-Finance RZ 18 260 WEST SAGARPUR NEAR MCD SCHOOL NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L4 | Admitted-Finance | |
| 5 | L5₹27.0 L+₹6.5 L (31.5%)Admitted-Finance 10 WARD NO 18 PLOT NO 34 KAMDENU FURNTIURE SIKAR RAJASTHAN 332025 | SIKAR | RAJASTHAN | 332025 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P S TRADERS L4 | SANJEEV ENTERPRISES L3 | Ruchi enterprises L5 | PRASAD ELECTRICALS L1 | AMIT ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of centrifugal pump set from foundation of capacity 30 HP after disconnecting all electrical connections and carryout repair, servicing, over hauling, cleaning / changing of Metal impellers, strainers & taking out from the base and refixing the same after repair incl flange, nuts, bolts, washers, welding, cutting, threading, lathe work, painting complete all as specified .
Note :- (i) Parts as mentioned below from srl item No 02 to 09 to be replaced under this item shall be paid as supply only and all other parts deemed to be included in quoted rate.
(ii) Except for lathe work, all other work must be carried out at the installation site strictly in the presence of the MES representative and no permission shall be granted for transportation to the workshop.
(iii) Transportation for lath work is deemd to be included in quoted rate. | 2 | Each Job | 2,500 ₹5,000 Lowest | 8,000 ₹16,000 | 30,000 ₹60,000 | 3,000 ₹6,000 | 12,222 ₹24,444 |
| 2.00 | Supply only ball bearing of 30 HP | 3 | Each | 300 ₹900 Lowest | 800 ₹2,400 | 999 ₹2,997 | 1,234 ₹3,702 | 2,222 ₹6,666 |
| 3.00 | Supply only tyre coupling of 30 HP | 2 | Each | 700 ₹1,400 Lowest | 1,500 ₹3,000 | 999 ₹1,998 | 1,324 ₹2,648 | 999 ₹1,998 |
| 4.00 | Supply only ci gland for 30 Hp Pump | 3 | Each | 200 ₹600 Lowest | 200 ₹600 Lowest | 999 ₹2,997 | 655 ₹1,965 | 999 ₹2,997 |
| 5.00 | Supply only SS shaft and shaft sleeves in 30 HP pump with complete nut, bolt & studs, flanged complete all as specified | 1 | Each | 200 ₹200 Lowest | 1,000 ₹1,000 | 5,000 ₹5,000 | 2,354 ₹2,354 | 5,555 ₹5,555 |
| 6.00 | Supply only key coupling for 30 Hp pump | 1 | Each | 300 ₹300 | 100 ₹100 | 99 ₹99 | 3,245 ₹3,245 | 55 ₹55 Lowest |
| 7.00 | Supply only bearing housing for 30 HP pump | 1 | Each | 700 ₹700 | 500 ₹500 | 99 ₹99 | 2,434 ₹2,434 | 55 ₹55 Lowest |
| 8.00 | Supply only lock washer for support foot for 30 HP pump | 1 | Each | 50 ₹50 Lowest | 100 ₹100 | 120 ₹120 | 455 ₹455 | 55 ₹55 |
| 9.00 | Supply only bearing cover DE suitable for 30 HP pump | 1 | Each | 290 ₹290 | 200 ₹200 Lowest | 3,000 ₹3,000 | 1,455 ₹1,455 | 777 ₹777 |
| 10.00 | Dismantling of centrifugal pump set from foundation of capacity 25 HP after disconnecting all electrical connections and carryout repair, servicing, over hauling, cleaning / changing of Metal impellers, strainers & taking out from the base and refixing the same after repair incl flange, nuts, bolts, washers, welding, cutting, threading, lathe work, painting complete all as specified .
Note :- (i) Parts as mentioned below from srl item No 11 to 18 to be replaced under this item shall be paid as supply only and all other parts deemed to be included in quoted rate.
(ii) Except for lathe work, all other work must be carried out at the installation site strictly in the presence of the MES representative and no permission shall be granted for transportation to the workshop.
(iii) Transportation for lath work is deemd to be included in quoted rate. | 6 | Each Job | 2,500 ₹15,000 Lowest | 5,000 ₹30,000 | 8,000 ₹48,000 | 3,000 ₹18,000 | 12,222 ₹73,332 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
8 Aug 2026, 6:00 pmClosed
GE E/M RR HOSP DELHI CANTT-10
GE E/M RR HOSP DELHI CANTT-10
REPAIR/ MAINT OF VARIOUS PUMP MOTOR SETS LT ELECTRIC PANELS INSTALLED IN PUMP HOUSES INCLUDING ALLIED WORK FOR MAINT OF WATER SUPPLY AND FIREFIGHTING SYSTEM AT AHRR UNDER GE E M RR HOSP DELHI CANTT-10
2026_MES_777889_1
GE/H/T-31/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE E/M RR HOSP DELHI CANTT-10
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE E/M RR HOSP DELHI CANTT-10
₹60,000
Yes
14 Aug 2026
11 Jul 2026
10 Aug 2026
11 Jul 2026
8 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of centrifugal pump set from foundation of capacity 30 HP after disconnecting all electrical connections and carryout repair, servicing, over hauling, cleaning / changing of Metal impellers, strainers & taking out from the base and refixing the same after repair incl flange, nuts, bolts, washers, welding, cutting, threading, lathe work, painting complete all as specified .
Note :- (i) Parts as mentioned below from srl item No 02 to 09 to be replaced under this item shall be paid as supply only and all other parts deemed to be included in quoted rate.
(ii) Except for lathe work, all other work must be carried out at the installation site strictly in the presence of the MES representative and no permission shall be granted for transportation to the workshop.
(iii) Transportation for lath work is deemd to be included in quoted rate. | 2 | Each Job | - | - |
| 2 | Supply only ball bearing of 30 HP | 3 | Each | - | - |
| 3 | Supply only tyre coupling of 30 HP | 2 | Each | - | - |
| 4 | Supply only ci gland for 30 Hp Pump | 3 | Each | - | - |
| 5 | Supply only SS shaft and shaft sleeves in 30 HP pump with complete nut, bolt & studs, flanged complete all as specified | 1 | Each | - | - |
| 6 | Supply only key coupling for 30 Hp pump | 1 | Each | - | - |
| 7 | Supply only bearing housing for 30 HP pump | 1 | Each | - | - |
| 8 | Supply only lock washer for support foot for 30 HP pump | 1 | Each | - | - |
| 9 | Supply only bearing cover DE suitable for 30 HP pump | 1 | Each | - | - |
| 10 | Dismantling of centrifugal pump set from foundation of capacity 25 HP after disconnecting all electrical connections and carryout repair, servicing, over hauling, cleaning / changing of Metal impellers, strainers & taking out from the base and refixing the same after repair incl flange, nuts, bolts, washers, welding, cutting, threading, lathe work, painting complete all as specified .
Note :- (i) Parts as mentioned below from srl item No 11 to 18 to be replaced under this item shall be paid as supply only and all other parts deemed to be included in quoted rate.
(ii) Except for lathe work, all other work must be carried out at the installation site strictly in the presence of the MES representative and no permission shall be granted for transportation to the workshop.
(iii) Transportation for lath work is deemd to be included in quoted rate. | 6 | Each Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
T31SoC.pdf
Additional Documents • 0.45 MB
TenderT31.pdf
Tender Documents • 1.28 MB
BOQ_871210.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .