Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC AT ASNAPANI P O KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR |
Tender Value
₹15.0 L
EMD Value
₹18,800
Closing Date
3 Oct 2023, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Power shifting and rearrangement for 37 Tandem development district of RIV seam of Khottadih Colliery.
2023_ECL_289457_1
GM-PND/EandM/23-24/92/3191 dated 21/09/2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹18,800
6 Nov 2023
23 Sept 2023
4 Oct 2023
23 Sept 2023
3 Oct 2023
23 Sept 2023
23 Sept 2023 - 26 Sept 2023
Amount
Power shifting and rearrangement for 37 Tandem development district of RIV seam of Khottadih Colliery. (Inclusive of CMPF and Contractor Profit)
Transportation of One 6.6Kv FLP VCB from 36 pump at RVI seam to surface
After repairing Transportation of 6.6kv FLP VCB from surface to RIV seam at 29L/7D
Connection of VCB before 29L/7D transformer by re-arranging HT cable to releasing 500 mtr 150 sqmm HT cable
Carring and shifting of of 500 mtrs 150 sqmm 6.6kv grade H.T. cable from 29L/8D and 35L/16D
Transportation of one 315 KVA,6.6KV/550 Transwitch unit from surface to 35L/16D
Transportation of one 6.6KV FLP Primary VCB from surface to 35L/16D
Coupling and Connection of Primary VCB with transformer and control circuit connection
Transportation of transformer Coupler with 50 mtr 25 sqmm H.T. Cable from surface to 35L/29D at RIV seam
Transportation of both secondary cable with coupler and cable entry from surface to 35L/16D
Connection of HT cable with transfromer primary and with VCB at 29L/7D
Transporation and shifting of 2 nos of MEL Make main ACB from 29L/7D to 35L/16D and placing near transformer secondary
Carring and transportation of 500 mtrs 70 sq mm 3.3 kv grade L.T. cable of 208LHD and 159 UDM (Main ACB to Dstrict ACB) from 29L/7D to 35l/16D and connection with 208 LHD side 250Amps MEL make ACB
Carring and transportation of 500 mtrs 70 sq mm 3.3 kv grade L.T. cable of 190 LHD and 085 UDM (from main ACB to District ACB) from 29L/7D to 25L/16D and connection with 190 LHD side 250Amps MEL make ACB
Carring and transportation of 250 mtrs 70 sq mm 3.3 kv grade L.T. cable from surface and connection with 100 amps MEL make ACB to provide power to 37 tendom belt motor
Transportation of District ACB of LHD 208 and 159 UDM from 35L/8D to 35L/24D
Carring and transportation of 400 mtr 70 sqmm pvc cable of LHD 208 (from District ACB to Gate end box) from 35L/8D to 35L/24D toward face
Transportation of District ACB of LHD 190 and 085 UDM from 36L/9D to 36L/24D
Carring and transportation of 300 mtr 70 sqmm pvc cable of LHD 179 (from District ACB to Gate end box) from 36L/9D to 36L/24D toward face
Shifting of LHD 208 Gate end box, 159 UDM gate end box, 2 nos of fan and fan starter , fan starter to motor cable as per face progress from 24D to 40D
Shifting of LHD 190 Gate end box, 085 UDM gate end box, fan and fan starter , fan starter to motor cable, Drill panel and Drill cable as per face progress upto 40D
Transportation of lighting panel, lighting cables & light from surface and fitting at 35L/16D
Hanging of all H.T. & L.T. cable
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .