| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | L1 | Accepted-AOC Work Order and SOQ | |
| 2 | L2₹15.2 L+₹1.6 L (11.4%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.4 L+₹1.7 L (12.8%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹15.6 L+₹1.9 L (13.9%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-Fee 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | - | Not Admitted-Fee Fee not received |
Tender Value
₹18.4 L
EMD Value
₹36,894
Closing Date
15 Nov 2019, 6:00 pmClosed
Asst. General Manager (Engg-E)
Airports Authority of India, Gokul Road, Hubballi Airport, Hubballi.
ARMO 2019-20, SH-OPERATION AND COMPREHENSIVE MAINTENANCE OF SPLIT AIR-CONDITIONING UNITS, RO WATER PURIFIERS AND WATER COOLERS AT HUBBALLI AIRPORT 2019 and 21
2019_AAI_35425_1
AAI/HUB/ENGG-E/NIT/Split AC/2019-20
Open Limited
Electrical Works
Item Rate
730 days
Hubballi Airport
Please refer Tender Document
8 documents required · 8 mandatory
₹1,120
Airports Authority of India
₹36,894
23 Oct 2020
8 Nov 2019
19 Nov 2019
8 Nov 2019
15 Nov 2019
8 Nov 2019
8 Nov 2019 - 11 Nov 2019
Amount
Job contract for operation and maintenance ( daily ) of different make TR HI-Wall Split type / Inverter split type Airconditioners /Cassete AC/Water Coolers/ Water Purifiers etc.(details of equipments etc. attached in SCC ) with min manpower of Skilled-1 No on all days including holidays including tools and plants and sundry materials but excluding weekly off & spare parts etc. complete as required as per terms and conditions in the contract.
Annual Comprehensive Maintenance of different make TR HI-Wall Split type/ Inverter split type Airconditioners, including gas charging, repair/ replacement of all defective parts and other associated accessories, compressor, cooling coil, blower condenser, refrigerant, thermostat, electonic parts like PC Boards, sensors, transformer, trandsducer etc and electrical parts upto socket outlet etc., along with voltage stabilizer with original/ company repaired parts, labour charges etc. attending breakdowns as and when required, at different locations including providing all necessary consumables and spares complete as required to keep the Equipment in serviceable Condition, as per AAI Special Conditions and site requirement and as per EIC instructions.
1.5TR Hi Wall Split AC (The AC Units are more than 8 years old)
1st Year
2nd year
2 TR Hi Wall Split AC (The AC Units are more than 8 years old)
1st Year
2nd year
3 TR Floor Mounted Split AC (The AC Units are more than 8 years old)
1st Year
2nd year
1.5 TR Inverter Split AC (5-star) (The ac units are installed on 31.03.2019). CMC will start with effect from 01.04.2020
1st Year
2nd year
4 TR Inverter Split AC (5-star) (The ac units are installed on 31.03.2019). CMC will start with effect from 01.04.2020
1st Year
2nd year
Annual Comprehensive Maintenance (Periodical, Preventive and Breakdown) of single phase 2.0 TR cassette split Air conditioner including providing all necessary consumables and spares as per OEM's recommendation and AAI Special Conditions etc. Complete as required (The ac units are more than 2 years old).
1st Year
2nd year
Annual Comprehensive Maintenance (Periodical, Preventive and Breakdown) of Blue Star make water coolers of cooling capacity 40 ltrs./ Hour and 80Ltrs storage tank including providing all necessary consumables and spares as per OEM's recommendation and AAI Special Conditions etc. Complete as required. (The Water coolers are 2 years old).
1st Year
2nd year
All Inclusive Comprehensive Maintenance through manufacturers/ authorized service dealers/ water purifier agencies of Following capacity RO purifier inlusive of adding antiscalant chemicals to avoid scaling of pipelines and when required replacement of prefilter cattridge once in three months, any other components such as membrane or any kind of filter complete, maintaining the required taste and required TDS level (30 to 120) and including providing test reports for the same, etc complete as required.
1st Year
2nd year
Dismantling and re-Installation, Testing and commissioning of Dismanteled Air Conditioner units including fixing of Indoor, Outdoor Units, making interconnections between indoor and Outdoor units with 3 C x1.5 sqmm copper cable i/c minor civil works such as drilling for holes, fininshing with the same and making interconnection of copper pipe lines/ refrigerant lines and control cables including supply and fixing of following and reqired gas Top up and Dismanteling of Existing Split Air Conditioners, etc complete as required.
Mahalaxmi Cooling Systems
COOL STAR
prakash electricals
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .