Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
9 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of Superintending Engineer PHED City Circle Ajmer
Annual Rate Contract For The Work Of Drilling Of Borehole For Hand Pump With Construction Of Sock Pit And Platform And Providing Installation And Commissioning With Defect Liability With All Required Material Including Under The Jurisdiction Of City
2026_PHCJA_533659_1
SE PHED District Circle NIT NO 12
Open Tender
Civil Works
Percentage
Ajmer
As per tender document
12 documents required · 12 mandatory
₹5,000
14698 EE PHED City Division II Ajmer
₹2.6 L
Yes
24 Feb 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.
Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Nominal bore 150 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Add 40% extra on above item (Item no 2) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr .
Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe.
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Nominal bore 150 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Construction of tube well from ground level and up to 100 mtr. depth and above of following sizes in all types of soils in alluvium strata, unconsolidated formation such as pebbles, boulders etc. by "bailing" method and without gravel packing as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work includes formation of cavity at bottom by development with appropriate air compressor or bailer pumping and also lowering of casing pipe but excluding cost of the casing pipe. The tube well should have a throughout bore as per nominal dia of casing pipe. The work would be completed after obtaining sand free water.
Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Nominal bore 150 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS: IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe including cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after obtaining sand free water.
Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Nominal bore 150 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Testing verticality of tube well by plumbing system and yield test and draw down test by pumping system as per IS : 2800 (Part – II) – 1979 or as per amended up to date.
Supplying & Packing P-gravel suitable for slot size/mesh size as suggested in IS 2800 (Part-1) 1991 or as per amended up to date.
Development of tube well having depth up to 250 mtr as per IS: 11189- 1985 and IS: 2800 (Part- I)- 1991 (both amended up to date) using suitable methods to give sand free water for required yield of the gravel packed tube well.
Supply of ERW M.S. black casing pipe ISI marked {IS:1239(Part-1:2004)} medium of following sizes at site of work.
100 mm dia NB (Thickness of pipe 4.5 mm & mass of tube 12.50 Kg/m)
125 mm dia NB( Thickness of pipe 4.8 mm & mass of tube 16.40 Kg/m)
Construction of 185 cm. dia platform as per approved design and drawing of UNICEF.
Installation of India Mark II/III E.D. I & II hand pump set complete on exisiting platform
Supply and installation of ISI marked India Mark II Hand pump set complete with cylinder & 15 connecting rods.
Supply and installation of ISI Marked India Mark II Hand pump set Extra-Deep (EDW) complete with cylinder and connecting rods.
EDWHP + 20 Connecting rod.
EDWHP + 23 Connecting rod + 1 Weight.
EDWHP + 26 Connecting rod + 2 Weight.
EDWHP + 30 Connecting rod + 3 Weight.
Supply and installation of ISI mark connecting rod as per departmental specifications of 3 meter length.
Construction of tube well from ground level and up to 100 mtr. depth and above of following sizes in all types of soils in alluvium strata, unconsolidated formation such as pebbles, boulders etc. by bailing method and without gravel packing as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work includes formation of cavity at bottom by development with appropriate air compressor or bailer pumping and also lowering of casing pipe but excluding cost of the casing pipe. The tube well should have a throughout bore as per nominal dia of casing pipe. The work would be completed after obtaining sand free water.
Nominal bore 100 mm dia.
Nominal bore 125 mm dia.
Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/2001) or amended up to date of following sizes
150 mm dia NB(Thickness of pipe 5.0 mm & mass of tube 20.13 Kg/m)
Construction of soakage well in all type of soil with 300 mm thick dry masonry, top and bottom 300 mm course in CM 1:6, 80mm thick stone slab, jointing of slab in CM 1 : 3, Ralthal, Kharanja, 40 mm thick M-15 grade C.C flooring , earthwork complete as per approved drawing including disposal of earth within a lead of 50 mtr.:
Size 300 Cm. dia outside & 300 Cm. depth .
-do- & 240 Cm. Depth
Size 240 Cm. dia outside & 240 Cm. depth
Providing, Laying, Jointing glazed S.W.Pipe grade 'A' (IS:651 marked) of apprvoed make with spun yarn & stiff mixture of cement mortar 1:1, excavation and refilling of earth in all type of soil up to 1.2 M depth, S.W. fittings including testing of joints etc. complete
100 MM Dia
150 MM Dia
Supply & installation of GI pipe 32 mm medium class “B” with pipe sockets (heavy duty).
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
Tender_12.pdf
Tender Documents • 1.29 MB
BOQ_951004.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .