| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC | ₹15.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.3 LRejected-Finance 28 1 NEAR KKSK MAHAAL BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | ₹15.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | R.Anbarasan L1 | R.K.Traders L2 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Pavement in Kulasekarapatti Indra nagar at Kulasekarapatty Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 3.64 | cum | 197 ₹717.08 Lowest | 205 ₹746.2 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 107.15 | cum | 5,434 ₹5,82,253.1 Lowest | 5,450 ₹5,83,967.5 |
| 4.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT | 15.29 | cum | 6,143 ₹93,926.47 Lowest | 6,150 ₹94,033.5 |
| 5.00 | Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 6.57 | cum | 408 ₹2,680.56 Lowest | 410 ₹2,693.7 |
| 6.00 | Centring shuttering the sides with necessary supports as per standard specifications including all labour charges etc complete | 55.14 | cum | 360 ₹19,850.4 Lowest | 370 ₹20,401.8 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including top Finish using Trowel Machine with necessary Genset Arrangements including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 76.9 | cum | 7,444 ₹5,72,443.6 Lowest | 7,500 ₹5,76,750 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 54.11 | Sq.m | 280 ₹15,150.8 Lowest | 290 ₹15,691.9 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,31,664 ₹2,31,664 Lowest | 2,32,971 ₹2,32,971 |
Tender Value
₹15.4 L
EMD Value
₹15,380
Closing Date
16 Jun 2026, 3:00 pmClosed
BDO (B.PT)
KEELAPAVOOR PANCHAYAT UNION
Providing Cement Concrete Pavement in Kulasekarapatti Indra nagar at Kulasekarapatty Panchayat/Kulasekarapatti Indra nagar CC Road
2026_RDTN_678689_1
Kulasekarapatti CC Road Indira Nagar
Open Tender
Civil Works - Roads
Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹15,380
Yes
22 Jun 2026
29 May 2026
16 Jun 2026
29 May 2026
16 Jun 2026
29 May 2026
29 May 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Cement Concrete Pavement in Kulasekarapatti Indra nagar at Kulasekarapatty Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 3.64 | cum | 197.84 | ₹720.14 |
| 3 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 107.15 | cum | 5,434.19 | ₹5,82,273.46 |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT | 15.29 | cum | 6,143.33 | ₹93,931.52 |
| 5 | Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 6.57 | cum | 408.3 | ₹2,682.53 |
| 6 | Centring shuttering the sides with necessary supports as per standard specifications including all labour charges etc complete | 55.14 | cum | 365 | ₹20,126.1 |
| 7 | Cement concrete 1:2:4 mix using 20mm ISS metal including top Finish using Trowel Machine with necessary Genset Arrangements including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 76.9 | cum | 7,444.03 | ₹5,72,445.91 |
| 8 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 54.11 | Sq.m | 284.27 | ₹15,381.85 |
| 9 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_815382.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_815382.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].