Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 LAccepted-Finance | 1 | Accepted-Finance lowest | |
| 2 | 2₹19.5 L+₹5.9 L (44.0%)Rejected-Finance | 2 | Rejected-Finance not lowest |
Tender Value
₹13.0 L
EMD Value
₹25,980
Closing Date
8 Jun 2021, 10:00 amClosed
Executive Engineer, M.C. Rohtak
Executive Engineer, M.C. Rohtak
Providing and Laying of Water Supply Line in Various Streets of Pehrawer Village, Rohtak. (re-call)
2021_HRY_173670_2
MCR/EE-I/2021/May/3works
Open Tender
Civil Works
Works
60 days
Rohtak
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹25,980
Yes
23 Jul 2021
31 May 2021
8 Jun 2021
31 May 2021
8 Jun 2021
31 May 2021
Amount
Supplying and laying Tee, bend, joint and reducer complete in all respect
Making inter connection of proposed pipe line with existing pipeline of DI/CI including excavation, dewatering, etc complete in all respect as directed by Engineer-in-Charge for 80-200 mm diameter proposed pipeline.
Making inter connection of proposed pipe line with existing pipe line of AC/PVC/HDPE/ including earth work, dewatering etc complete in respect as directed by site engineer for 80-300 mm diameter proposed pipeline
House Service Connection : making house sercie connection from water suply distribution pipe line as per drawing attached.
Bidder Name
Amount
Somvir Singh Contractor(GSTN-NA)
THE VIKASH CO-OP L&C SOCIETY LTD(GSTN-NA)
THE VIKASH CO-OP L&C SOCIETY LTD
THE VIKASH CO-OP L&C SOCIETY LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .