Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
17 Dec 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/Madurai
SE/GCC/MADURAI
Construction revetment wall around the tower at Loc No.42 in 110KV Meenakshipuram Thengampudur
2020_EB_187479_1
SE-GCC-MDU SPEC.NO.043/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹12,500
Yes
24 Dec 2020
11 Dec 2020
18 Dec 2020
11 Dec 2020
17 Dec 2020
11 Dec 2020
180 days
Amount
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B
Providing PCC 1:4:8 without formwork using 40mm size machine crushed HBG metal including cost of materials, labour, lead, lift, curing, etc. complete
RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) with formwork including cost labour, materials, lead, lift, curing etc complete. But excluding cost of steel reinforcement (By using mixer machine and vibrator). COLUMN
RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) with formwork including all cost labour materials lead lift curing etc complete but excluding cost of steel reinforcement (By using mixer machine and vibrator) BEAM
PCC 1:2:4 using 20mm metal with formwork including cost of all materials, labour charges, curing charges, lead, lift etc. complete
Providing Reinforcement for all R.C.C. Works including cost of steel and all lead, lift, labour for cutting, bending and Placing reinforcement as per plan and Tying with binding wire and including Cost of binding wire, labour and work at all levels etc. complete
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers including cost of labour, materials, lead, lift, curing, etc., complete.
RR masonry in CM 1:6 mix using hard blue granite stone for foundation and basement including cost of labour, materials, lead, lift, curing, etc., complete.
Plastering with C.M 1:3, 12 mm thick including cost of materials, labour, lead, lift, curing, etc., complete
Pointing with CM 1:3 mix for RR masonry including cost of materials, labour, lead, lift, etc. complete.
Supplying & fixing of 50mm dia PVC pipe @ 6 kg/cm² including cost of materials, lead, lift, labour, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .