Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.0 L+₹44,643.20 (29.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.1 L+₹56,719.52 (36.8%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Yougesh B Class Contractor L3 | SAFEENA BEGUM L2 | BIKRAM PARIHAR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 174.68 | Cum | 310 ₹54,150.8 | 323 ₹56,421.64 | 180 ₹31,442.4 Lowest |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 19.28 | Cum | 2,100 ₹40,488 | 2,600.65 ₹50,140.56 | 450 ₹8,676 Lowest |
| 3.00 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 65.06 | Sqm | 650 ₹42,289 | 450 ₹29,277 | 180 ₹11,710.8 Lowest |
| 4.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 1,115.24 | Sqm | 23 ₹25,650.52 | 20 ₹22,304.8 Lowest | 50 ₹55,762 |
| 5.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 20 ft complete job as per directed by the site incharge 58.97445 Cft a) Engage 4 Carpenter for 5 days for making 2 foot bridge of Span 30 ft. | 20 | No | 750 ₹15,000 | 700 ₹14,000 Lowest | 1,350 ₹27,000 |
| 6.00 | Engage 4 Labour for 5 days for making 2 foot bridge of Span 30 ft | 20 | No | 600 ₹12,000 | 400 ₹8,000 Lowest | 450 ₹9,000 |
| 7.00 | Providing and fixing of Nails | 6 | Kg | 75 ₹450 Lowest | 100 ₹600 | 100 ₹600 |
| 8.00 | Extraction , transportation and Labur of Wood for making & Fixing of Wooden Sign boards 1'x1.5' on different areas including painting and writing | 6 | No | 500 ₹3,000 | 600 ₹3,600 | 450 ₹2,700 Lowest |
| 9.00 | Extraction , transportation and Labur of Wood for making & Fixing of Wooden Sign boards 3'x2' on different areas including painting and writing as per desired by site incharge | 6 | No | 700 ₹4,200 | 700 ₹4,200 | 180 ₹1,080 Lowest |
| 10.00 | Carriage of materials from source to site of work by M.T. A) Stone av. HL 400 mtr | 33.92 | Cum | 400 ₹13,568 | 300 ₹10,176 | 180 ₹6,105.6 Lowest |
Tender Value
₹2.5 L
EMD Value
₹7,455
Closing Date
11 Oct 2025, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar.
Kishtwar
Maintenance of Inspection path Path Clearing Widening Surface Preparation Drainage works Safety Barriers Signage Installation at Kibbar Wildlife Division Kishtwar for the Year 2025-26 Under Mitigation Plan of KHANP.
2025_FD_289395_2
NIT 11 of 2025-26 Inspection path Kibar
Open Tender
Civil Works
Item Wise
60 days
Kibar, Dachhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Wildlife Warden Chenab Division,Kishtwar.
₹7,455
18 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
11 Oct 2025
4 Oct 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .