Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹7.3 L+₹41,838.85 (6.06%)Rejected-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | ₹7.3 L+₹41,838.85 (6.06%) | L2 | Rejected-Finance ok |
| 3 | L3₹7.8 L+₹89,353.87 (12.9%)Rejected-Finance BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹7.8 L+₹89,353.87 (12.9%) | L3 | Rejected-Finance ok |
| 4 | Rejected-Technical NOT SPECIFIED IN THE DOCUMENT | - | - | Rejected-Technical Since Clause-III has already been imposed on your Agency/Society/Firm, hence as per direction of worthy Executive Engineer your tender has been rejected |
Tender Value
₹9.2 L
EMD Value
₹18,320
Closing Date
7 Feb 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
A/mtc estimate for main Water works Bhiwani for the year 2025-2026.
2026_HBC_500105_1
2026511EEE0C 8608 408C B82E B8088340820C259HSV
Open Tender
Civil Works
Works
90 days
Bhiwani
Construction of Brick Drain for collecting of excess, leakage and overflow water from filter unit and collection it into making into Pond near SS Tank No. 2 at Main Water Works Bhiwani and all other works contingent thereto
2 documents required · 2 mandatory
₹500
Yes
₹18,320
Yes
21 Apr 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
7 Feb 2026
2 Feb 2026
[10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4
[11.113]Lettering with black Japan paint of approved brand and manufacture
[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand)
[11.52]Cement rendering on plaster 1 mm thick
[15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m
[4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
stage.html
html • 0.05 MB
techsummary_578708.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_578708.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .