Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Finance MAUDAHA HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210301 | -34.51% | ₹13.6 L | L1 | Admitted-Finance |
| 2 | L2₹13.9 L+₹34,142.15 (2.52%)Admitted-Finance | -32.86% | ₹13.9 L+₹34,142.15 (2.52%) | L2 | Admitted-Finance |
| 3 | L3₹14.0 L+₹45,109.02 (3.33%)Admitted-Finance | -32.33% | ₹14.0 L+₹45,109.02 (3.33%) | L3 | Admitted-Finance |
| 4 | L4₹14.0 L+₹49,661.30 (3.66%)Admitted-Finance | -32.11% | ₹14.0 L+₹49,661.30 (3.66%) | L4 | Admitted-Finance |
| 5 | L5₹14.1 L+₹54,420.51 (4.02%)Admitted-Finance | -31.88% | ₹14.1 L+₹54,420.51 (4.02%) | L5 | Admitted-Finance |
Tender Value
₹20.7 L
EMD Value
₹2.1 L
Closing Date
30 Jan 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Hamirpur
Executive Engineer Minor Irrigation Hamirpur
Bada Pond, Baank, Sumerpur
2026_UPMID_1107399_5
2728/MI/NIVIDA/2025-26 DATE 09-01-2026
Open Tender
Civil Works
Percentage
45 days
Hamirpur
As per Tender Notice
2 documents required · 2 mandatory
₹2,354
Executive Engineer Minor Irrigation Hamirpur
₹2.1 L
Yes
Executive Engineer Minor Irrigation Hamirpur
16 Feb 2026
20 Jan 2026
31 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
20 Jan 2026
Excavation in earthwork in Mar, Kabar, Ranker and Kankar Mixed soil in digging including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (Ch-4, 4.04(e))
Excavation in earthwork (by any means) in Mar, Kabar, Ranker and Kankar Mixed soil in digging including lead up to 30m and lift (beyond 3.00m lift) including dressing making profile and manual compaction but excluding mechnical compation. (UPID SI No. 4.15)
Excavation in earthwork (by any means) in Mar, Kabar, Ranker and Kankar removal of slus (Excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (UPID SI No. 4.13)
Excavation in earthwork (by any means) in Mar, Kabar, Ranker and Kankar sturated soil in digging including lead up to 30m and lift (beyond 3.00m lift) upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (UPID SI No. 4.17)
Excavation in earthwork (by any means) in Mar, Kabar, Ranker and Kankar removal of slus (Excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (UPID SI No. 4.12)
Earthworki in foundation of wall piers abutments etc with disposal with in 30m lead and 1.5m lift by hydraulic/mechanical excavator ID S.No. (b)
Sand filling for foundation Inlet, Outlet, Ramp
C.C. in 1:3:6 cement, Sand and 20-40mm gauge stone ballast including the cost of materials labours and etc. required for proper completion of work.
R.C.R. Stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work.
Supply of fixing of 1000mm dia NP3 hume pipe with coller all cost complete.
C.C. in 1:2:4 cement, Sand and 10-20mm grit including the cost of materials labours and etc. required for proper completion of work.
Plastering in 1:2 cement sand mortar including the cost of material labour etc. to required for proper completion of work.
Dry Stone boulder filling in chamber
Dewatering during work by 8hp DP Set
Supply and fixing of Sigh Board
Plantation in embankment
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.47 MB
BOQ_2043977.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .