Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC H NO 861 12 SALARA MOHALLA ROHTAK 124001 HARYANA INDIA | ROHTAK | HARYANA | 124001 | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹7.1 L (7.05%)Rejected-Finance | ₹1.1 Cr+₹7.1 L (7.05%) | L2 | Rejected-Finance L2 |
Tender Value
₹77.3 L
EMD Value
₹1.5 L
Closing Date
11 Feb 2022, 5:00 pmClosed
Executive Engineer Elect Div. PWD B and R Hisar
Executive Engineer Elect Div. PWD B and R Hisar
CONSTRUCTION OF APPROACHES OF 2 LANE ROB AT LC NO. 114 AT KM 172/1-2 ON REWARI BHATINDA RAILWAY LINE AT ADAMPUR IN DISTT HISAR (PDG. SHIFTING OF EXISTING HT/ LT LINES ONLY)
2022_HRY_205403_1
Eect-GGN/Elect-HSR/100280
Open Tender
Electrical Works
Works
120 days
HISAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹1.5 L
Yes
1 Jun 2022
27 Jan 2022
14 Feb 2022
27 Jan 2022
11 Feb 2022
27 Jan 2022
Amount
A. New Materials: PCC pole 11 mtr. Long
A. New Materials: PCC pole 9 mtr. Long
A. New Materials: MS Stay 8" Complete
A. New Materials: Stay Wire 7/8 SWG
A. New Materials: ACSR No. 3 SWG
A. New Materials: 11 KV v Shape X arm 75x40x6
A. New Materials: 11 KV Top Hamper
A. New Materials: 11 KV Pin Insulator with Pin
A. New Materials: 11 KV Disc Fitting
A. New Materials: 11 KV Disc insulator
A. New Materials: 11 KV GO Switch complete for 11 Mtr H Pole
A. New Materials: T/F Plate from set comp.
A. New Materials: GI Pipe 40 mm diameter for earthing
A. New Materials: GI strip 25x6mm for earthing
A. New Materials: LT insulator
A. New Materials: LS's 9 KV 10 KV Haevy duty
A. New Materials: nuts & Bolts off size
A. New Materials: GI Chanel 100x50x6 ( 2200 mm for H Pole X arm
A. New Materials: GI Chanel 75x40x6 ( 2200 mm for RD Fuse
A. New Materials: GI Chanel 75x40x6 (T-off 3350 mm) for wooden cleat
A. New Materials: GI Angle 50x50x6 ( 2400 mm) for earth wire
A. New Materials: GI Angle 50x50x6 ( 2200 mm) belting for H Pole
A. New Materials: GI Angle 50x50x6 ( 2860 mm) bracing for H Pole
A. New Materials: Half Clamp
A. New Materials: Full Clamp
A. New Materials: LT Fuse unit board
A. New Materials: Allu. Thimble off size
A. New Materials: 2/C PVC Cable 10 mm
A. New Materials: LT AB Cable 3x120mm
A. New Materials: S/C LT PVC Cable 185 mm
A. New Materials: S/C LT PVC Cable 300 mm
A. New Materials: 4/C LT PVC Cable 16mm
A. New Materials: 11 KV XLPE Cable 3x185mm
A. New Materials: 11 KV XLPE Cable 3x95mm
A. New Materials: 11 KV XLPE outdoor termination Kit 3x185mm
A. New Materials: 11 KV XLPE Cable U/G Streight Joint Kit 3x185mm
A. New Materials: 11 KV XLPE outdoor termination Kit 3x95 mm
A. New Materials: 11 KV XLPE Cable U/G Streight Joint Kit 3x95mm
A. New Materials: PVC Tape role 3/4
A. New Materials: wooden cleat for hanging cable
A. New Materials: CI pipe 250mm dia 14 mm thick for U/G Cable
A. New Materials: Sundry Charge to complete the job
B: Errection of materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work. E/O of PCC 9 M long
B: E/O of PCC 11 M long
B: E/O of H pole with Two Stay
B: E/O of RD Fuse with fitting
B: E/O Stay set complete
B: E/O of 11 KV GO switch Complete ( Main T-Off)
B: installation S/ Phase PVC service length upto 30 mtr
B: installation 3/ Phase PVC service length upto 30 mtr
B: installation S/ Phase Meter with MCB
B: installation 3/ Phase Meter with MCB
B: E/O GI Strip
B: Earth boring for GI Pipe
B: E/O T/F 100 KVA pole mouting s/stn
B: E/O T/F 25 KVA pole mouting s/stn
B: E/O T/F 200 KVA pole mouting s/stn
B: E/O HT XLPE Cable 3x185mm
B: E/O HT XLPE Cable 3x95mm
B: E/O LT AB Cable 3x120x70mm
B: E/O HT Cable straight joint
B: E/O of Cable Box
B: laying of C.I. pipe
B: Loading + Unloading of 9 Mtr PCC Pole
B: Loading + Unloading of 11 Mtr PCC Pole
B: Trans of 9 Mtr PCC Pole from store to site of work
B: Trans of 11 Mtr PCC Pole from store to site of work
B: Trans Charges of ACSR+Cable @1% of cost 2830530/-
C: Labour Charge dismentle of material (C) C: PCC pole 9 mtr. Long ( unservicable)
C: H-Pole Complete with two stay
C: S/Phase PVC service length upto 30 mtr
C: 3/Phase PVC service length upto 30 mtr
C: S/Phase meter with MCB
C: 3/Phase meter with MCB
C: T/F 25 KVA
C: T/F 100 KVA
C: T/F 200 KVA
C: LTAB Cable 3x50+35
C: ACSR 6 Swg
Telmos Electronics
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .